The challenge of monitoring PPP projects: Proposal of a conceptual 5-dimension KPI’s model

Bruno Lima, C. Cruz
{"title":"The challenge of monitoring PPP projects: Proposal of a conceptual 5-dimension KPI’s model","authors":"Bruno Lima, C. Cruz","doi":"10.19255/JMPM02006","DOIUrl":null,"url":null,"abstract":"Public-private partnerships (PPPs) have been used worldwide in infrastructure and public service provision as an alternative procurement model to traditional public work contracts. There are several benefits arising from the use of PPPs such as greater efficiency and value for money, but there is a pitfall that has significantly affected its performance: the lack of adequate monitoring by public authorities. This led to excessive renegotiations and problems of information asymmetry. Contract management remains as one of the main challenges in the PPP domain, if not the most relevant. This paper intends to minimize this gap, proposing a framework for key performance indicators (KPIs) categories that should be integrated in these contracts, enabling the grantor to effectively monitor the performance of the projects thus reducing information asymmetry problems. The KPIs category model proposed in this article congregates five groups of KPIs: operational indicators, financial indicators, relational indicators, environmental indicators and social indicators.","PeriodicalId":320094,"journal":{"name":"The Journal of Modern Project Management","volume":"19 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2019-10-16","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"5","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"The Journal of Modern Project Management","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.19255/JMPM02006","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 5

Abstract

Public-private partnerships (PPPs) have been used worldwide in infrastructure and public service provision as an alternative procurement model to traditional public work contracts. There are several benefits arising from the use of PPPs such as greater efficiency and value for money, but there is a pitfall that has significantly affected its performance: the lack of adequate monitoring by public authorities. This led to excessive renegotiations and problems of information asymmetry. Contract management remains as one of the main challenges in the PPP domain, if not the most relevant. This paper intends to minimize this gap, proposing a framework for key performance indicators (KPIs) categories that should be integrated in these contracts, enabling the grantor to effectively monitor the performance of the projects thus reducing information asymmetry problems. The KPIs category model proposed in this article congregates five groups of KPIs: operational indicators, financial indicators, relational indicators, environmental indicators and social indicators.
监督PPP项目的挑战:提出一个概念性的5维KPI模型
公私伙伴关系(ppp)作为一种替代传统公共工程合同的采购模式,已在世界范围内用于基础设施和公共服务提供。使用公私合作伙伴关系可以带来一些好处,例如提高效率和物有所值,但存在一个严重影响其绩效的陷阱:公共当局缺乏充分的监测。这导致了过度的重新谈判和信息不对称问题。合同管理仍然是PPP领域的主要挑战之一,如果不是最相关的。本文旨在最大限度地减少这一差距,提出了一个关键绩效指标(kpi)类别框架,该框架应整合到这些合同中,使授予人能够有效地监控项目的绩效,从而减少信息不对称问题。本文提出的kpi分类模型将kpi分为五组:运营指标、财务指标、关系指标、环境指标和社会指标。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信