Real-time reactive security monitoring

B. Avramovic, L. Fink
{"title":"Real-time reactive security monitoring","authors":"B. Avramovic, L. Fink","doi":"10.1109/PICA.1991.160604","DOIUrl":null,"url":null,"abstract":"Severe economic penalties are imposed by constraints on energy transfers imposed by contingent voltage support problems. The analysis outlined uses the granularity that characterizes power networks to define zones within which reactive reserves must match contingent reactive power requirements in order to avoid voltage support problems. The tracking of reserves relative to contingent requirements provides an online indication of safe operating conditions, including energy transfers, relative to postcontingency conditions.<<ETX>>","PeriodicalId":287152,"journal":{"name":"[Proceedings] Conference Papers 1991 Power Industry Computer Application Conference","volume":"64 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"1991-05-07","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"29","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"[Proceedings] Conference Papers 1991 Power Industry Computer Application Conference","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/PICA.1991.160604","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 29

Abstract

Severe economic penalties are imposed by constraints on energy transfers imposed by contingent voltage support problems. The analysis outlined uses the granularity that characterizes power networks to define zones within which reactive reserves must match contingent reactive power requirements in order to avoid voltage support problems. The tracking of reserves relative to contingent requirements provides an online indication of safe operating conditions, including energy transfers, relative to postcontingency conditions.<>
实时响应式安全监控
由于偶发电压支持问题,对能量转移的限制造成了严重的经济损失。本文的分析使用电网特征的粒度来定义无功储备必须满足突发无功需求的区域,以避免电压支持问题。与应急需求相关的储量跟踪提供了安全运行条件的在线指示,包括相对于应急后条件的能源转移。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信