Assessment of alternative reserve procurement strategies for the Italian Power System

Maria Carmen Falvo, F. Quaglia, L. Luzi, Sara Perfetti, Enrico Maria Carlini, M. Caprabianca
{"title":"Assessment of alternative reserve procurement strategies for the Italian Power System","authors":"Maria Carmen Falvo, F. Quaglia, L. Luzi, Sara Perfetti, Enrico Maria Carlini, M. Caprabianca","doi":"10.23919/AEIT53387.2021.9627054","DOIUrl":null,"url":null,"abstract":"In most of the European countries reserve (e.g. balancing capacity) is procured in advance to the day-ahead market. At the opposite, in Italy, reserve is procured in the spot ancillary service market which held after the day-ahead market. This paper presents an assessment of the potential impacts of procuring reserve in advance to the day-ahead market, in the framework of the Italian electricity market. The aim of this approach is to anticipate potential scarcity conditions in order to ensure secure operation. This goal can be achieved by making price signals, raising from the day-ahead market, comparable with other countries. The paper describes the characteristics of the possible new reserve procurement model and its impact, in terms of outcomes and costs, of both the energy and ancillary services markets in Italy. Different scenarios are identified in order to find the optimal solutions to improve the reserve procurement process so as to ensure coherent price signals in case of scarcity conditions, without increasing system costs.","PeriodicalId":138886,"journal":{"name":"2021 AEIT International Annual Conference (AEIT)","volume":"110 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2021-10-04","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"2021 AEIT International Annual Conference (AEIT)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.23919/AEIT53387.2021.9627054","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

In most of the European countries reserve (e.g. balancing capacity) is procured in advance to the day-ahead market. At the opposite, in Italy, reserve is procured in the spot ancillary service market which held after the day-ahead market. This paper presents an assessment of the potential impacts of procuring reserve in advance to the day-ahead market, in the framework of the Italian electricity market. The aim of this approach is to anticipate potential scarcity conditions in order to ensure secure operation. This goal can be achieved by making price signals, raising from the day-ahead market, comparable with other countries. The paper describes the characteristics of the possible new reserve procurement model and its impact, in terms of outcomes and costs, of both the energy and ancillary services markets in Italy. Different scenarios are identified in order to find the optimal solutions to improve the reserve procurement process so as to ensure coherent price signals in case of scarcity conditions, without increasing system costs.
评估意大利电力系统备用采购战略
在大多数欧洲国家,储备(如平衡能力)是提前购买到前一天的市场。相反,在意大利,储备是在现货辅助服务市场购买的,该市场在日前市场之后举行。本文在意大利电力市场的框架下,对提前购买储备对日前市场的潜在影响进行了评估。这种方法的目的是预测潜在的稀缺条件,以确保安全运行。这一目标可以通过发出价格信号来实现,从前一天的市场上涨,与其他国家比较。本文描述了可能的新储备采购模式的特点及其在结果和成本方面对意大利能源和辅助服务市场的影响。在不增加系统成本的情况下,确定不同的情景,以找到改善储备采购过程的最佳解决方案,以确保在稀缺条件下价格信号一致。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信