Impact of electric utility and customer modifications on existing medium voltage circuit breakers

K. R. Shah, E. R. Detjen, D. Epley
{"title":"Impact of electric utility and customer modifications on existing medium voltage circuit breakers","authors":"K. R. Shah, E. R. Detjen, D. Epley","doi":"10.1109/IAS.1988.25259","DOIUrl":null,"url":null,"abstract":"The authors discuss seven factors that can increase circuit-breaker duties at existing installations and provide detailed analyses of possible corrective actions to alleviate the breaker overstressing problem, with special reference to the National Institute of Health's system. They emphasize a need for cooperation between large customers and the utility to obtain a mutually beneficial solution to the problem and prevent the recurrence of similar problems in the future.<<ETX>>","PeriodicalId":274766,"journal":{"name":"Conference Record of the 1988 IEEE Industry Applications Society Annual Meeting","volume":"4 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"1988-10-02","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Conference Record of the 1988 IEEE Industry Applications Society Annual Meeting","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/IAS.1988.25259","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 1

Abstract

The authors discuss seven factors that can increase circuit-breaker duties at existing installations and provide detailed analyses of possible corrective actions to alleviate the breaker overstressing problem, with special reference to the National Institute of Health's system. They emphasize a need for cooperation between large customers and the utility to obtain a mutually beneficial solution to the problem and prevent the recurrence of similar problems in the future.<>
电力公司和客户修改对现有中压断路器的影响
作者讨论了在现有装置中可能增加断路器负荷的七个因素,并提供了可能的纠正措施的详细分析,以减轻断路器过载问题,特别参考了国家卫生研究所的系统。他们强调大客户和公用事业公司之间需要合作,以获得一个互利的解决问题的办法,并防止今后类似问题的再次发生。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信