{"title":"Workflow execution data analysis based on personnel fuzzy evaluation","authors":"Lei Feng, Youda Li, Xin Zhang","doi":"10.1109/FSKD.2013.6816230","DOIUrl":null,"url":null,"abstract":"This paper presents a fuzzy evaluation scheme of personnel ability based on the workflow execution data analysis. It supports the activities of the estimated execution time and the activities of the personnel task allocation. This paper uses personnel analysis reports of workflow logs to calculate the relative deviation of the average completion time as a role and combine with fuzzy logic to calculate the capacity value for the different roles of the staff. The capacity value is corrective according to the staff of the present work load. We get the current ability value list. Finally, this paper puts forward the calculation method to estimate time of completing a task according to the current capability values list.","PeriodicalId":368964,"journal":{"name":"2013 10th International Conference on Fuzzy Systems and Knowledge Discovery (FSKD)","volume":"27 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2013-07-23","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"2013 10th International Conference on Fuzzy Systems and Knowledge Discovery (FSKD)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/FSKD.2013.6816230","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 1
Abstract
This paper presents a fuzzy evaluation scheme of personnel ability based on the workflow execution data analysis. It supports the activities of the estimated execution time and the activities of the personnel task allocation. This paper uses personnel analysis reports of workflow logs to calculate the relative deviation of the average completion time as a role and combine with fuzzy logic to calculate the capacity value for the different roles of the staff. The capacity value is corrective according to the staff of the present work load. We get the current ability value list. Finally, this paper puts forward the calculation method to estimate time of completing a task according to the current capability values list.