Simulation-based evaluation of the ramp-up behavior of waferfabs

R. Sturm, J. Dorner, K. Reddig, J. Seidelmann
{"title":"Simulation-based evaluation of the ramp-up behavior of waferfabs","authors":"R. Sturm, J. Dorner, K. Reddig, J. Seidelmann","doi":"10.1109/ASMC.2003.1194478","DOIUrl":null,"url":null,"abstract":"In this paper we present a simulation study of wafer fab ramp-up scenarios with the simulation software AutoSched AP. A generic factory model (MIMAC 1 from Int. SEMATECH) was adapted to simulate fab ramp-up scenarios. The model was customized to consider time phased modeling capability and time phased reporting. Additionally, an evaluation approach for the comparison of different ramp-up simulation scenarios is presented. This approach helps to evaluate the ramp-up performance with different input parameters. A systematic variation of dispatch rules and lot sizes during ramp-up is shown.","PeriodicalId":178755,"journal":{"name":"Advanced Semiconductor Manufacturing Conference and Workshop, 2003 IEEEI/SEMI","volume":"13 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2003-04-22","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"5","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Advanced Semiconductor Manufacturing Conference and Workshop, 2003 IEEEI/SEMI","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/ASMC.2003.1194478","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 5

Abstract

In this paper we present a simulation study of wafer fab ramp-up scenarios with the simulation software AutoSched AP. A generic factory model (MIMAC 1 from Int. SEMATECH) was adapted to simulate fab ramp-up scenarios. The model was customized to consider time phased modeling capability and time phased reporting. Additionally, an evaluation approach for the comparison of different ramp-up simulation scenarios is presented. This approach helps to evaluate the ramp-up performance with different input parameters. A systematic variation of dispatch rules and lot sizes during ramp-up is shown.
基于仿真的晶圆片爬坡行为评估
在本文中,我们使用仿真软件AutoSched AP对晶圆厂爬坡场景进行了仿真研究。SEMATECH)适用于模拟工厂爬坡场景。对模型进行了定制,以考虑分阶段建模能力和分阶段报告。此外,还提出了一种评估方法,用于比较不同的爬坡模拟场景。这种方法有助于评估不同输入参数下的爬坡性能。系统变化的调度规则和批量大小期间斜坡显示。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信