{"title":"Locational signals in electricity market design: Do they really matter?","authors":"S. Hadush, P. Buijs, R. Belmans","doi":"10.1109/EEM.2011.5953086","DOIUrl":null,"url":null,"abstract":"This study identifies potential electricity market design (EMD) approaches of sending Locational Signals (LS) that guide the location of generation plants. The stability, predictability and strength of LS from each approach are evaluated using cases from European electricity market. Additionally, important LS outside EMD are identified and compared against the signals from EMD. The paper concludes that LS from EMD do not always matter. Policy makers should be aware of the many factors influencing generation investments when setting up or changing an EMD and assess the potential of the envisaged incentives in relation with other incentives within and outside the EMD.","PeriodicalId":143375,"journal":{"name":"2011 8th International Conference on the European Energy Market (EEM)","volume":"1 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2011-05-25","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"6","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"2011 8th International Conference on the European Energy Market (EEM)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/EEM.2011.5953086","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 6

Abstract

This study identifies potential electricity market design (EMD) approaches of sending Locational Signals (LS) that guide the location of generation plants. The stability, predictability and strength of LS from each approach are evaluated using cases from European electricity market. Additionally, important LS outside EMD are identified and compared against the signals from EMD. The paper concludes that LS from EMD do not always matter. Policy makers should be aware of the many factors influencing generation investments when setting up or changing an EMD and assess the potential of the envisaged incentives in relation with other incentives within and outside the EMD.
电力市场设计中的位置信号:它们真的重要吗?
本研究确定潜在的电力市场设计(EMD)方法,以发送位置信号(LS)来指导发电厂的位置。利用欧洲电力市场的案例,对每种方法的稳定性、可预测性和强度进行了评估。此外,识别EMD外的重要LS,并将其与EMD信号进行比较。本文的结论是,来自EMD的LS并不总是重要的。决策者在建立或改变电力市场发展计划时,应意识到影响发电投资的许多因素,并评估所设想的激励措施与电力市场发展计划内外其他激励措施的潜力。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信