MAPPING POTENTIAL FOR WIND ENERGY IN COASTAL MARINE SENGGIGI FOR RENEWABLE ENERGY DEVELOPMENT SUPPORT

Muliadi, Eliza Ruwaidah, Akhmad Asyari
{"title":"MAPPING POTENTIAL FOR WIND ENERGY IN COASTAL MARINE SENGGIGI FOR RENEWABLE ENERGY DEVELOPMENT SUPPORT","authors":"Muliadi, Eliza Ruwaidah, Akhmad Asyari","doi":"10.22146/ajse.v3i1.5683","DOIUrl":null,"url":null,"abstract":"His form of energy self-sufficient villages throughout Indonesia is the government's goal in the field of energy. Utilization of wind energy as a renewable energy source is an attempt to answer the problem for change and the natural environment is also one of the conservation of conventional energy sources. The purpose of this research study is to get the wind potential in accordance with the site characteristics such as speed and direction as a basis for planning SKEA. Potential awakened power of the wind potential and value of the benefits to be derived based on economic analysis if the potential energy is utilized for the generation of renewable energy on the grid system. The method used is the method of distribution. The results of the analysis of wind energy potential in Selaparang in 2011 until 2013, increased in 2011 the potential energy of 278, 5 KW KW rose to 562.5 in 2012 and in 2013 to 522, 4 KW wind speed has increased so the potential for increased power. Increased wind speed at the beginning of the year and the end of the rainy season occurred. The magnitude of the potential of wind energy can be used for supplying the electricity needs of the population about the number of households 500. The potential of wind energy in Kediri in 2011 until 2013, the image can be seen that the energy per year decline in 2011 the potential energy of 1751.33 KW dropped to 636 , 96 KW in 2012 and declined in 2013 to 44.954 KW wind speed so that the lower the potential for wind power down. Economic analysis produces BCR value of 1.4. Wind speed in Kediri greater than in Senggigi same year, but increased wind speeds in Senggigi and in Kediri decreased.","PeriodicalId":280593,"journal":{"name":"ASEAN Journal of Systems Engineering","volume":"58 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2015-07-31","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"ASEAN Journal of Systems Engineering","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.22146/ajse.v3i1.5683","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 1

Abstract

His form of energy self-sufficient villages throughout Indonesia is the government's goal in the field of energy. Utilization of wind energy as a renewable energy source is an attempt to answer the problem for change and the natural environment is also one of the conservation of conventional energy sources. The purpose of this research study is to get the wind potential in accordance with the site characteristics such as speed and direction as a basis for planning SKEA. Potential awakened power of the wind potential and value of the benefits to be derived based on economic analysis if the potential energy is utilized for the generation of renewable energy on the grid system. The method used is the method of distribution. The results of the analysis of wind energy potential in Selaparang in 2011 until 2013, increased in 2011 the potential energy of 278, 5 KW KW rose to 562.5 in 2012 and in 2013 to 522, 4 KW wind speed has increased so the potential for increased power. Increased wind speed at the beginning of the year and the end of the rainy season occurred. The magnitude of the potential of wind energy can be used for supplying the electricity needs of the population about the number of households 500. The potential of wind energy in Kediri in 2011 until 2013, the image can be seen that the energy per year decline in 2011 the potential energy of 1751.33 KW dropped to 636 , 96 KW in 2012 and declined in 2013 to 44.954 KW wind speed so that the lower the potential for wind power down. Economic analysis produces BCR value of 1.4. Wind speed in Kediri greater than in Senggigi same year, but increased wind speeds in Senggigi and in Kediri decreased.
为支持可再生能源发展,绘制沿海地区风能潜力图
他在印尼各地建立能源自给自足的村庄是政府在能源领域的目标。风能作为一种可再生能源的利用,是对变化与自然环境问题的一种尝试,也是对常规能源的一种节约。本研究的目的是获得符合场地特征的风势,如风速和方向,作为SKEA规划的基础。基于经济分析,如果将潜在能源用于电网系统的可再生能源发电,风电潜力的潜在觉醒力和价值将得到的效益。使用的方法是分配法。分析结果显示,2011年至2013年西拉勃郎的风能潜力增加,2011年的潜在能量从2785kw增加到2012年的562.5 KW, 2013年的风速增加到5224kw,因此潜在功率增加。在年初和雨季结束时,风速增加。风能潜力的大小可以用来满足大约500户人口的电力需求。Kediri的风能潜力从2011年到2013年,从图像中可以看出,风能每年下降,从2011年的1751.33 KW下降到2012年的63696 KW,从2013年的风速下降到44.954 KW,使风电潜力下降。经济分析得出BCR值为1.4。Kediri的风速大于Senggigi,但Senggigi和Kediri的增加风速减小。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信