Human Resources Management Planning for Increasing Precast Productivity Based on PMBOK at Xyz Company

Fertilia Novika Candra, Adji Raden Yudityo Afri
{"title":"Human Resources Management Planning for Increasing Precast Productivity Based on PMBOK at Xyz Company","authors":"Fertilia Novika Candra, Adji Raden Yudityo Afri","doi":"10.29138/ijeeit.v3i1.1074","DOIUrl":null,"url":null,"abstract":"In the era of globalization, it will demand every company to produce good quality products and also quickly in the completion of the product. Xyz Company is a company engaged in manufacturing. The company produce PCI Girder, Spunpile, U-ditch, and Barrier. But production activities there is a mismatch between the plans and the realization that has been made by the company, especially on spunpile products. The purpose of this study is to find out occurrence that affect human resource management planning and to find out how to manage these occurrence. For the method used, the authors used the method of interviewing, observing and distributing questionnaires. The analysis used is the validity test, reliability test, frequency index, severity index and importance index. The results of this study are that Xyz company has 4 variables that are most influential in human resource management planning.","PeriodicalId":137789,"journal":{"name":"IJEEIT : International Journal of Electrical Engineering and Information Technology","volume":"34 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2020-07-22","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"IJEEIT : International Journal of Electrical Engineering and Information Technology","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.29138/ijeeit.v3i1.1074","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

In the era of globalization, it will demand every company to produce good quality products and also quickly in the completion of the product. Xyz Company is a company engaged in manufacturing. The company produce PCI Girder, Spunpile, U-ditch, and Barrier. But production activities there is a mismatch between the plans and the realization that has been made by the company, especially on spunpile products. The purpose of this study is to find out occurrence that affect human resource management planning and to find out how to manage these occurrence. For the method used, the authors used the method of interviewing, observing and distributing questionnaires. The analysis used is the validity test, reliability test, frequency index, severity index and importance index. The results of this study are that Xyz company has 4 variables that are most influential in human resource management planning.
Xyz公司基于PMBOK提高预制件生产率的人力资源管理计划
在全球化的时代,它将要求每一个公司生产出优质的产品,并迅速完成产品。Xyz公司是一家从事制造业的公司。公司生产PCI梁、砂堆、u型沟、护栏。但在生产活动中,公司的计划和实现之间存在不匹配,特别是在纺堆产品上。本研究的目的是找出影响人力资源管理规划的事件,并找出如何管理这些事件。在方法上,作者采用了访谈、观察和发放问卷的方法。使用的分析方法是效度检验、信度检验、频率指标、严重程度指标和重要性指标。本研究的结果是Xyz公司在人力资源管理规划中有4个最具影响力的变量。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信