{"title":"Investigation of SSR risk in Akkuyu NEPP","authors":"Ozgur Tanidir, M. E. Cebeci","doi":"10.1109/ELECO.2013.6713831","DOIUrl":null,"url":null,"abstract":"Subsynchronous Resonance (SSR) is the build-up of electrical and mechanical vibrations in power system as a result of interactions and energy interchanges between a turbine generator set and the rest of the power system which leads to significant shaft damages In general, power plants close to the series compensation may prone to several subsynchronous interactions, hence the risk analysis studies should be conducted to prevent possible hazardous effects. In this paper, SSR risk for Akkuyu NEPP which will be built in the southern region of Turkey close to series compensated transmission lines is investigated. The paper first provides brief information related to SSR phenomenon, types of SSR and techniques to analyze phenomenon. After, SSR study methodology for Akkuyu NEPP case and results are presented. Results of this study have revealed that there will be no SSR risk exists for planned network connection of Akkuyu NEPP.","PeriodicalId":108357,"journal":{"name":"2013 8th International Conference on Electrical and Electronics Engineering (ELECO)","volume":"41 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2013-11-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"2013 8th International Conference on Electrical and Electronics Engineering (ELECO)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/ELECO.2013.6713831","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0
Abstract
Subsynchronous Resonance (SSR) is the build-up of electrical and mechanical vibrations in power system as a result of interactions and energy interchanges between a turbine generator set and the rest of the power system which leads to significant shaft damages In general, power plants close to the series compensation may prone to several subsynchronous interactions, hence the risk analysis studies should be conducted to prevent possible hazardous effects. In this paper, SSR risk for Akkuyu NEPP which will be built in the southern region of Turkey close to series compensated transmission lines is investigated. The paper first provides brief information related to SSR phenomenon, types of SSR and techniques to analyze phenomenon. After, SSR study methodology for Akkuyu NEPP case and results are presented. Results of this study have revealed that there will be no SSR risk exists for planned network connection of Akkuyu NEPP.