{"title":"Investigation of SSR risk in Akkuyu NEPP","authors":"Ozgur Tanidir, M. E. Cebeci","doi":"10.1109/ELECO.2013.6713831","DOIUrl":null,"url":null,"abstract":"Subsynchronous Resonance (SSR) is the build-up of electrical and mechanical vibrations in power system as a result of interactions and energy interchanges between a turbine generator set and the rest of the power system which leads to significant shaft damages In general, power plants close to the series compensation may prone to several subsynchronous interactions, hence the risk analysis studies should be conducted to prevent possible hazardous effects. In this paper, SSR risk for Akkuyu NEPP which will be built in the southern region of Turkey close to series compensated transmission lines is investigated. The paper first provides brief information related to SSR phenomenon, types of SSR and techniques to analyze phenomenon. After, SSR study methodology for Akkuyu NEPP case and results are presented. Results of this study have revealed that there will be no SSR risk exists for planned network connection of Akkuyu NEPP.","PeriodicalId":108357,"journal":{"name":"2013 8th International Conference on Electrical and Electronics Engineering (ELECO)","volume":"41 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2013-11-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"2013 8th International Conference on Electrical and Electronics Engineering (ELECO)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/ELECO.2013.6713831","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

Subsynchronous Resonance (SSR) is the build-up of electrical and mechanical vibrations in power system as a result of interactions and energy interchanges between a turbine generator set and the rest of the power system which leads to significant shaft damages In general, power plants close to the series compensation may prone to several subsynchronous interactions, hence the risk analysis studies should be conducted to prevent possible hazardous effects. In this paper, SSR risk for Akkuyu NEPP which will be built in the southern region of Turkey close to series compensated transmission lines is investigated. The paper first provides brief information related to SSR phenomenon, types of SSR and techniques to analyze phenomenon. After, SSR study methodology for Akkuyu NEPP case and results are presented. Results of this study have revealed that there will be no SSR risk exists for planned network connection of Akkuyu NEPP.
阿库尤东北平原SSR风险调查
次同步共振(SSR)是由于汽轮发电机组与电力系统其他部分之间的相互作用和能量交换导致电力系统中电气和机械振动的累积,导致严重的轴损坏。通常,靠近串联补偿的发电厂可能容易发生多次次同步相互作用,因此应进行风险分析研究,以防止可能的危险影响。本文对将建在土耳其南部靠近串联补偿输电线路的Akkuyu NEPP的SSR风险进行了研究。本文首先简要介绍了SSR现象的相关信息、SSR的类型以及分析SSR现象的技术。在此基础上,提出了对阿库尤地区NEPP案例的SSR研究方法和结果。本研究结果表明,阿库尤新干线规划网络连接不存在SSR风险。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信