Optimasi Upah Dan Tenaga Kerja Pada Proyek Perumahan Graha Famili Surabaya

Diah Listyaningsih, Anton Sulistiawan, M. Aulady
{"title":"Optimasi Upah Dan Tenaga Kerja Pada Proyek Perumahan Graha Famili Surabaya","authors":"Diah Listyaningsih, Anton Sulistiawan, M. Aulady","doi":"10.33084/mits.v11i2.4248","DOIUrl":null,"url":null,"abstract":"Linear programming can be an alternative in solving problems in the construction sector. In construction work there is a workforce, but the allocation of the number of workers used requires good planning. If the allocation of the number of the worker is optimal, then the costs incurred for labor wages are also more efficient. For this reason, this study aims to optimize wages and the number of workers in construction projects. In performing optimization, the method used is simplex analysis. The simplex method is a linier program that can be used more than 3 variables, to solve the problem by iterating or recalculation until it reaches the optimal solution. The results of this are a decrease in the cost of labor wages, for concrete work there is a decrease in the cost of labor wages by 8,60%, and ceiling work there is a decrease in the cost of labor wages by 58,59%.","PeriodicalId":380506,"journal":{"name":"Media Ilmiah Teknik Sipil","volume":"79 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2023-06-14","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Media Ilmiah Teknik Sipil","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.33084/mits.v11i2.4248","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

Linear programming can be an alternative in solving problems in the construction sector. In construction work there is a workforce, but the allocation of the number of workers used requires good planning. If the allocation of the number of the worker is optimal, then the costs incurred for labor wages are also more efficient. For this reason, this study aims to optimize wages and the number of workers in construction projects. In performing optimization, the method used is simplex analysis. The simplex method is a linier program that can be used more than 3 variables, to solve the problem by iterating or recalculation until it reaches the optimal solution. The results of this are a decrease in the cost of labor wages, for concrete work there is a decrease in the cost of labor wages by 8,60%, and ceiling work there is a decrease in the cost of labor wages by 58,59%.
泗水家族格拉哈住房项目的工资和劳动力优化
线性规划是解决建筑领域问题的另一种选择。在建筑工作中有劳动力,但工人数量的分配需要良好的规划。如果工人数量的分配是最优的,那么劳动力工资所产生的成本也更有效。因此,本研究旨在优化建筑项目的工资和工人数量。在进行优化时,使用的方法是单纯形分析。单纯形法是一种可以使用3个以上变量的线性程序,通过迭代或重新计算直至达到最优解来求解问题。这样做的结果是劳动工资成本下降,具体工作的劳动工资成本下降了8.60%,天花板工作的劳动工资成本下降了58.59%。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信