Discussion on the Architectural Design of the Turbine Building of a Nuclear Power Project Phase I (Ap1000)

Zhaohui Huang
{"title":"Discussion on the Architectural Design of the Turbine Building of a Nuclear Power Project Phase I (Ap1000)","authors":"Zhaohui Huang","doi":"10.26789/jzjg.2019.01.006","DOIUrl":null,"url":null,"abstract":"A nuclear power project phase I (AP1000) has many “world No.1”. It is so many “first”, put forward unprecedented challenges to the design of the turbine building. This paper introduces the composition of each part of the turbine building, and analyses the problems of the turbine building, such as traffic evacuation, fire prevention, waterproof, lighting, ventilation, corrosion prevention. The characteristics of turbine building design are further discussed. The energy saving of turbine building and the design method and process of the building facade are also analyzed. The completion and production of the Nuclear Power Project Phase I have accumulated valuable experience and provided reference for subsequent projects.","PeriodicalId":305807,"journal":{"name":"城市建设理论研究—建筑结构","volume":"18 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"1900-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"城市建设理论研究—建筑结构","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.26789/jzjg.2019.01.006","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

A nuclear power project phase I (AP1000) has many “world No.1”. It is so many “first”, put forward unprecedented challenges to the design of the turbine building. This paper introduces the composition of each part of the turbine building, and analyses the problems of the turbine building, such as traffic evacuation, fire prevention, waterproof, lighting, ventilation, corrosion prevention. The characteristics of turbine building design are further discussed. The energy saving of turbine building and the design method and process of the building facade are also analyzed. The completion and production of the Nuclear Power Project Phase I have accumulated valuable experience and provided reference for subsequent projects.
核电一期工程(Ap1000)汽轮机厂房建筑设计探讨
核电一期工程(AP1000)有多个“世界第一”。正是如此多的“第一”,对水轮机建筑的设计提出了前所未有的挑战。介绍了水轮机建筑各部分的组成,分析了水轮机建筑的交通疏散、防火、防水、照明、通风、防腐等问题。进一步讨论了水轮机建筑设计的特点。分析了汽轮机建筑的节能及建筑立面的设计方法和流程。核电项目一期的建成投产积累了宝贵的经验,为后续项目提供了借鉴。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信