DEVELOPMENT OF UPPER OVERBURDEN BENCHES OF THE PIT USING LOADERS AND EXCAVATORS

O. Anisimov, O. Cherniaiev, L. Hrytsenko
{"title":"DEVELOPMENT OF UPPER OVERBURDEN BENCHES OF THE PIT USING LOADERS AND EXCAVATORS","authors":"O. Anisimov, O. Cherniaiev, L. Hrytsenko","doi":"10.31474/2073-9575-2022-1(27)-2(28)-78-86","DOIUrl":null,"url":null,"abstract":"Purpose. Investigate and compare technological schemes with the use of extraction and loading equipment and the organization of work during the development of the front of mining operations. Consider the parameters of benches when extracting soft overburdened rocks. Obtain indicators of time to accelerate the working out of rocks in the upper overburden horizons. Methods. Analytical and grapho-analytical methods were used to determine the time for carrying out operations during extraction and loading operations. When determining the expediency of using the extraction and loading equipment, the analysis method was applied, and the results were compared. Research results. It was established that the use of a loader in the face compared to excavators has its advantages related to maneuverability, absence of dependence on power grids, and execution of auxiliary operations without the involvement of additional mining machines. Technological schemes for the use of loaders and excavators during loading into railway transport were considered. Calculations were made, and the deadlines for loading overburden at the extraction site were graphically displayed. Scientific novelty. The obtained indicators make it possible to determine the terms at which effective execution of work will be achieved in a short time for loaders and excavators with a mechanical shovel. It will make it possible to significantly improve the current planning of mining operations when working out the upper horizons of deep pits. Practical significance. In pits of many countries engaged in the extraction of minerals when extracting rock and soft rocks, in addition to excavators, front loaders with different bucket capacities are increasingly used. The article proves that in the upper horizons of many deep pits, the loading of soft rocks can be carried out more efficiently when loaders are used as the main production unit. Key words: pit, loader, excavator, soft rocks, duration of mining operations, railway transport.","PeriodicalId":430946,"journal":{"name":"SCIENTIFIC PAPERS OF DONNTU Series: “The Mining and Geology”","volume":"109 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"1900-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"SCIENTIFIC PAPERS OF DONNTU Series: “The Mining and Geology”","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.31474/2073-9575-2022-1(27)-2(28)-78-86","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

Purpose. Investigate and compare technological schemes with the use of extraction and loading equipment and the organization of work during the development of the front of mining operations. Consider the parameters of benches when extracting soft overburdened rocks. Obtain indicators of time to accelerate the working out of rocks in the upper overburden horizons. Methods. Analytical and grapho-analytical methods were used to determine the time for carrying out operations during extraction and loading operations. When determining the expediency of using the extraction and loading equipment, the analysis method was applied, and the results were compared. Research results. It was established that the use of a loader in the face compared to excavators has its advantages related to maneuverability, absence of dependence on power grids, and execution of auxiliary operations without the involvement of additional mining machines. Technological schemes for the use of loaders and excavators during loading into railway transport were considered. Calculations were made, and the deadlines for loading overburden at the extraction site were graphically displayed. Scientific novelty. The obtained indicators make it possible to determine the terms at which effective execution of work will be achieved in a short time for loaders and excavators with a mechanical shovel. It will make it possible to significantly improve the current planning of mining operations when working out the upper horizons of deep pits. Practical significance. In pits of many countries engaged in the extraction of minerals when extracting rock and soft rocks, in addition to excavators, front loaders with different bucket capacities are increasingly used. The article proves that in the upper horizons of many deep pits, the loading of soft rocks can be carried out more efficiently when loaders are used as the main production unit. Key words: pit, loader, excavator, soft rocks, duration of mining operations, railway transport.
利用装载机和挖掘机开发基坑上覆盖层工作台
目的。调查和比较技术方案,使用提取和装载设备和工作组织在采矿作业的发展过程中。在提取软质超载岩石时,考虑台架参数。获得时间指标,以加快上覆盖层岩石的开采。方法。采用分析和图形分析方法确定提取和装载过程中进行操作的时间。在确定使用提取和装载设备的便利性时,应用了分析方法,并对结果进行了比较。研究的结果。已经确定,与挖掘机相比,在工作面使用装载机具有可操作性,不依赖电网以及在不涉及额外采矿机的情况下执行辅助作业的优势。考虑了装载机和挖掘机在铁路运输中使用的技术方案。进行了计算,并以图形显示了在提取地点装载覆盖层的最后期限。科学的新奇。所获得的指标使人们能够确定装载机和带机械铲的挖掘机在短时间内有效完成工作的条件。这将有可能在计算深坑上层时大大改进目前采矿作业的规划。现实意义。在许多国家从事矿物开采的矿坑中,在开采岩石和软岩时,除了挖掘机外,越来越多地使用不同斗容量的前装载机。通过实践证明,在许多深基坑上部,以装载机为主要生产设备,可以更有效地进行软岩的装填。关键词:坑,装载机,挖掘机,软岩,采矿作业时间,铁路运输。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信