Production Scheduling Optimization of Prefabricated Components Based on Improved Artificial Fish Swarm Algorithm

Chunguang Chang, Manqing Wang, Shen Wang
{"title":"Production Scheduling Optimization of Prefabricated Components Based on Improved Artificial Fish Swarm Algorithm","authors":"Chunguang Chang, Manqing Wang, Shen Wang","doi":"10.1145/3565387.3565427","DOIUrl":null,"url":null,"abstract":"In this paper, the production scheduling problem of prefabricated hybrid flow shop is studied. Resource constraints such as limited labor, limited buffer and steam maintenance parallel machine are considered in the actual production process, and an optimization model of production scheduling is established to minimize production cost, storage cost and delay cost. The maximum permutation method is used to arrange the discrete data, and then the artificial fish swarm algorithm is improved by combining the modified adjustment operation and mutation operation of genetic algorithm. Finally, by analyzing the actual production case of a prefabricated component factory, it is verified that the improved artificial fish swarm algorithm has good optimization and convergence.","PeriodicalId":182491,"journal":{"name":"Proceedings of the 6th International Conference on Computer Science and Application Engineering","volume":"24 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2022-10-21","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Proceedings of the 6th International Conference on Computer Science and Application Engineering","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1145/3565387.3565427","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

In this paper, the production scheduling problem of prefabricated hybrid flow shop is studied. Resource constraints such as limited labor, limited buffer and steam maintenance parallel machine are considered in the actual production process, and an optimization model of production scheduling is established to minimize production cost, storage cost and delay cost. The maximum permutation method is used to arrange the discrete data, and then the artificial fish swarm algorithm is improved by combining the modified adjustment operation and mutation operation of genetic algorithm. Finally, by analyzing the actual production case of a prefabricated component factory, it is verified that the improved artificial fish swarm algorithm has good optimization and convergence.
基于改进人工鱼群算法的预制构件生产调度优化
本文研究了装配式混合流水车间的生产调度问题。在实际生产过程中考虑了有限的人工、有限的缓冲器、汽保并联机等资源约束,建立了以生产成本、仓储成本和延误成本最小为目标的生产调度优化模型。采用最大置换法对离散数据进行排列,然后结合遗传算法的修正调整操作和突变操作对人工鱼群算法进行改进。最后,通过某装配式组件厂的实际生产案例分析,验证了改进的人工鱼群算法具有良好的优化和收敛性。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信