An expert project management assistant

D. Russell
{"title":"An expert project management assistant","authors":"D. Russell","doi":"10.1109/ANNES.1995.499471","DOIUrl":null,"url":null,"abstract":"The paper discusses the management of large multi-layer projects and the need for computer assistance in the development of cohesive planning. Any system that purports to assist an experienced project manager, must itself contain embedded intelligence to be of any use. As projects are fragmented and subsequently abstracted back into the parent-project, limited recursive procedures must indicate the potential effect of the lower order plan and offer the responsible manager options and remediations before accepting changes. A sub-goal of the system is the preclusion of redundant task dependencies and the avoidance of inadvertent logic-loops. The system uses a consistent GUI (graphical user interface) and context-sensitive help and explanation procedures.","PeriodicalId":123427,"journal":{"name":"Proceedings 1995 Second New Zealand International Two-Stream Conference on Artificial Neural Networks and Expert Systems","volume":"25 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"1995-11-20","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Proceedings 1995 Second New Zealand International Two-Stream Conference on Artificial Neural Networks and Expert Systems","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/ANNES.1995.499471","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

The paper discusses the management of large multi-layer projects and the need for computer assistance in the development of cohesive planning. Any system that purports to assist an experienced project manager, must itself contain embedded intelligence to be of any use. As projects are fragmented and subsequently abstracted back into the parent-project, limited recursive procedures must indicate the potential effect of the lower order plan and offer the responsible manager options and remediations before accepting changes. A sub-goal of the system is the preclusion of redundant task dependencies and the avoidance of inadvertent logic-loops. The system uses a consistent GUI (graphical user interface) and context-sensitive help and explanation procedures.
专业的项目管理助理
本文讨论了大型多层项目的管理,以及在制定内聚规划时计算机辅助的必要性。任何旨在帮助有经验的项目经理的系统,其本身必须包含任何有用的嵌入式智能。由于项目被分割并随后被抽象回父项目,有限的递归过程必须指示低阶计划的潜在影响,并在接受更改之前向负责任的经理提供选项和补救措施。该系统的子目标是排除冗余的任务依赖关系和避免无意的逻辑循环。该系统使用一致的GUI(图形用户界面)和上下文敏感的帮助和解释程序。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信