{"title":"Research Methodology","authors":"S. Rajasekar, P. Philominathan, V. Chinnathambi","doi":"10.4018/978-1-5225-8389-9.ch002","DOIUrl":null,"url":null,"abstract":"The purpose of this study using the qualitative approach was to discover the gap that exists among the uses of PM, RM, and KM tools and techniques used in various IT projects. The primary objective of the current chapter was to propose an appropriate research methodology practiced for assessing and examining KM, RM, and PM during the undertaking the IT projects as well as to comprehend by what means KM and RM become a part of PM.","PeriodicalId":132099,"journal":{"name":"Knowledge Management Techniques for Risk Management in IT Projects","volume":"21 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2006-01-03","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"22","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Knowledge Management Techniques for Risk Management in IT Projects","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.4018/978-1-5225-8389-9.ch002","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 22
Abstract
The purpose of this study using the qualitative approach was to discover the gap that exists among the uses of PM, RM, and KM tools and techniques used in various IT projects. The primary objective of the current chapter was to propose an appropriate research methodology practiced for assessing and examining KM, RM, and PM during the undertaking the IT projects as well as to comprehend by what means KM and RM become a part of PM.