Project Resource Optimization Considering Labor Productivity Factors

Kamal Jaafar, Roman Shaylo
{"title":"Project Resource Optimization Considering Labor Productivity Factors","authors":"Kamal Jaafar, Roman Shaylo","doi":"10.19255/JMPM02603","DOIUrl":null,"url":null,"abstract":"Labor cost takes a central place during the operation of a company's activities due to its high monetary value and importance on its production. This is one of the priority questions on how to minimize labor costs and improve efficiency of workers. Timeframe, quality and works delivery on time are the most significant factors for project development. It is highly dependable on the efficiency of resources, factors related to its performance. When it comes to actual work and execution on site, work which executed by less qualified technicians or managers with irrelevant or not sufficient enough knowledge and experience may result in a low quality of work, mistakes which may need to be recovered on a later stages creating delays in a project schedule, additional cost, resources, project failure. This research we will be emphasizing on optimization of activities related to a construction field and on how to measure, execute, allocate available or proposed resources to a specific task to achieve a required level of performance.","PeriodicalId":320094,"journal":{"name":"The Journal of Modern Project Management","volume":"87 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2021-05-15","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"The Journal of Modern Project Management","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.19255/JMPM02603","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

Labor cost takes a central place during the operation of a company's activities due to its high monetary value and importance on its production. This is one of the priority questions on how to minimize labor costs and improve efficiency of workers. Timeframe, quality and works delivery on time are the most significant factors for project development. It is highly dependable on the efficiency of resources, factors related to its performance. When it comes to actual work and execution on site, work which executed by less qualified technicians or managers with irrelevant or not sufficient enough knowledge and experience may result in a low quality of work, mistakes which may need to be recovered on a later stages creating delays in a project schedule, additional cost, resources, project failure. This research we will be emphasizing on optimization of activities related to a construction field and on how to measure, execute, allocate available or proposed resources to a specific task to achieve a required level of performance.
考虑劳动生产率因素的项目资源优化
劳动力成本由于其较高的货币价值和对生产的重要性,在公司的经营活动中占有中心地位。如何最大限度地降低劳动力成本,提高工人的工作效率,这是当务之急之一。时间框架、质量和按时交付是项目开发最重要的因素。它高度依赖于资源的效率,以及与其性能相关的因素。当涉及到实际工作和现场执行时,由不合格的技术人员或管理人员执行的工作与无关或缺乏足够的知识和经验可能导致工作质量低,错误可能需要在后期阶段恢复,从而导致项目进度延迟,额外的成本,资源,项目失败。本研究我们将重点关注与建筑领域相关的活动的优化,以及如何衡量、执行、分配可用或建议的资源来完成特定的任务,以达到所需的性能水平。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信