Automating the data center operation: 'Do we have a choice?' 'Can we manage it effectively?'

L. Hendershot
{"title":"Automating the data center operation: 'Do we have a choice?' 'Can we manage it effectively?'","authors":"L. Hendershot","doi":"10.1109/MASS.1990.113574","DOIUrl":null,"url":null,"abstract":"The author focuses on the management processes for supporting the technical aspects of automation. The tasks associated with automation are console messages, tape mounts, and printer output. These tasks and many others are segregated into categories which make up multiple projects associated with automating management information systems (MIS), including the data center. The projects are broken into five functional areas: input, control, process, output, and management processes. Techniques for managing the automation process are presented along with time frames for automation.<<ETX>>","PeriodicalId":282025,"journal":{"name":"[1990] Digest of papers. Tenth IEEE Symposium on Mass Storage Systems@m_Crisis in Mass Storage","volume":"54 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"1990-05-07","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"[1990] Digest of papers. Tenth IEEE Symposium on Mass Storage Systems@m_Crisis in Mass Storage","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/MASS.1990.113574","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 1

Abstract

The author focuses on the management processes for supporting the technical aspects of automation. The tasks associated with automation are console messages, tape mounts, and printer output. These tasks and many others are segregated into categories which make up multiple projects associated with automating management information systems (MIS), including the data center. The projects are broken into five functional areas: input, control, process, output, and management processes. Techniques for managing the automation process are presented along with time frames for automation.<>
数据中心运营自动化:我们有选择吗?“我们能有效地管理吗?”
作者着重于支持自动化技术方面的管理过程。与自动化相关的任务是控制台消息、磁带挂载和打印机输出。这些任务和许多其他任务被划分为不同的类别,这些类别构成与自动化管理信息系统(MIS)(包括数据中心)相关的多个项目。项目分为五个功能领域:输入、控制、过程、输出和管理过程。介绍了管理自动化过程的技术以及自动化的时间框架
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信