Jitter concerns in periodic task systems

Sanjoy Baruah, Deji Chen, A. Mok
{"title":"Jitter concerns in periodic task systems","authors":"Sanjoy Baruah, Deji Chen, A. Mok","doi":"10.1109/REAL.1997.641270","DOIUrl":null,"url":null,"abstract":"A model for periodic tasks is proposed that explicitly incorporates jitter-the uncertainty in the arrival times of individual frames. Feasibility-analysis of systems of such tasks is studied in the context of dynamic-priority, preemptive, uniprocessor scheduling. From a computational complexity perspective, the problem is shown to be no more difficult than feasibility analysis in systems of periodic tasks that do not exhibit jitter. Several feasibility analysis algorithms are presented and proven correct.","PeriodicalId":231201,"journal":{"name":"Proceedings Real-Time Systems Symposium","volume":"29 41","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"1997-12-03","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"33","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Proceedings Real-Time Systems Symposium","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/REAL.1997.641270","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 33

Abstract

A model for periodic tasks is proposed that explicitly incorporates jitter-the uncertainty in the arrival times of individual frames. Feasibility-analysis of systems of such tasks is studied in the context of dynamic-priority, preemptive, uniprocessor scheduling. From a computational complexity perspective, the problem is shown to be no more difficult than feasibility analysis in systems of periodic tasks that do not exhibit jitter. Several feasibility analysis algorithms are presented and proven correct.
周期性任务系统中的抖动问题
提出了一种包含抖动的周期性任务模型,即单个帧到达时间的不确定性。在动态优先级、抢占式、单处理机调度的背景下,研究了这类任务系统的可行性分析。从计算复杂性的角度来看,这个问题并不比不表现出抖动的周期性任务系统的可行性分析更困难。提出了几种可行性分析算法,并经验证是正确的。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信