Sagar A. Wadi, Shamreena Verghese, V. Balaji, V. Suresh, G. Anbunesan
{"title":"Ancillary services in Indian power system – Implementation challenges","authors":"Sagar A. Wadi, Shamreena Verghese, V. Balaji, V. Suresh, G. Anbunesan","doi":"10.18311/ijprvd/2021/30038","DOIUrl":null,"url":null,"abstract":"Reserve regulatory ancillary service (RRAS) was implemented on 12th April 2016 in Indian power system to empower the system operator to maintain the frequency in IEGC band, regulate line loadings, loss of generation or load, etc. This paper discusses the challenges in implementation of RRAS.","PeriodicalId":226140,"journal":{"name":"Indian Journal of Power and River Valley Development","volume":"57 25","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2022-04-24","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Indian Journal of Power and River Valley Development","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.18311/ijprvd/2021/30038","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0
Abstract
Reserve regulatory ancillary service (RRAS) was implemented on 12th April 2016 in Indian power system to empower the system operator to maintain the frequency in IEGC band, regulate line loadings, loss of generation or load, etc. This paper discusses the challenges in implementation of RRAS.