How Does FERC Select Venue Under FPA Sections 31(d)(3) and 317

Andrew R. Corcoran
{"title":"How Does FERC Select Venue Under FPA Sections 31(d)(3) and 317","authors":"Andrew R. Corcoran","doi":"10.1002/gas.21898","DOIUrl":null,"url":null,"abstract":"Historically very few Federal Energy Regulatory Commission (FERC) investigations have resulted in federal district court proceedings pursuant to an investigative target's election to proceed under the provisions in Section 31(d)(3) of the Federal Power Act (FPA).1 In the last few years, however, FERC has filed six such separate actions in four different federal district courts as of the date of this writing.2 This increased frequency is not surprising given the higher stakes now involved.3 Particularly when coupled with the recent changes to FERC's substantive authority, however, the increasing number of judicial proceedings is exposing some novel and significant issues.","PeriodicalId":311429,"journal":{"name":"Natural Gas & Electricity","volume":"433 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2016-04-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Natural Gas & Electricity","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1002/gas.21898","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

Historically very few Federal Energy Regulatory Commission (FERC) investigations have resulted in federal district court proceedings pursuant to an investigative target's election to proceed under the provisions in Section 31(d)(3) of the Federal Power Act (FPA).1 In the last few years, however, FERC has filed six such separate actions in four different federal district courts as of the date of this writing.2 This increased frequency is not surprising given the higher stakes now involved.3 Particularly when coupled with the recent changes to FERC's substantive authority, however, the increasing number of judicial proceedings is exposing some novel and significant issues.
FERC如何根据FPA第31(d)(3)和317条选择场地
历史上,很少有联邦能源监管委员会(FERC)的调查根据《联邦电力法》(FPA) 1第31(d)(3)条的规定而导致联邦地区法院的诉讼程序然而,在过去几年中,截至撰写本文之日,联邦能源监管委员会已在四个不同的联邦地区法院提起了六次此类单独诉讼考虑到现在涉及的更高的风险,这种增加的频率并不奇怪然而,特别是在最近联邦能源监管委员会实质性权力发生变化的情况下,越来越多的司法程序暴露出一些新的重大问题。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信