{"title":"Analisis Perhitungan Asam Klorida (HCl) Sebagai Pengontrol pH pada Air Cooling Tower pada Pabrik Pembangkit Listrik Tenaga Sampah (PLTSa)","authors":"Hernowo Widodo, Rino Dwiatmaja","doi":"10.31599/bpe.v1i3.1720","DOIUrl":null,"url":null,"abstract":"The Garbage Power Plant (PLTSa) has a water cycle in which heat transfer occurs in the cooling tower. This study looked for the pH level of the hot ratio using samples from hydrochloric acid (HCl) tanks and cooling tower (CT) output water samples. The results obtained by several comparisons of testing and analysis were obtained by 3.6 Liters of adding hydrochloric acid (HCl) to the tank so that the heat transfer that runs on the cooling tower has a pH level of 7. If the pH level is already 7 the possibility for acids or bases to be small and can preventing and maintaining heat transfer flows.process.\nKeywords: Cooling tower, hydrochloric acid, calculation analysis, PLTSa\nReference:\nAkbar. 2014. Pembangkit Listrik Tenaga Sampah.\nhttp://makassargreen.blogspot.co.id/2014/03/pembangkit-listrik-tenaga sampah.html.\nBadan Penerapan dan Pengkajian Teknologi. (2019). BPPT Hadirkan Inovasi PLTSa Merah Putih Bantargebang, Solusi Atasi Timbunan Sampah di Kota Besar. Jakarta: Badan Penerapan dan Pengkajian Teknologi. Diambil dari BADAN PENGKAJIAN DAN PENERAPAN TEKNOLOGI - BPPT Hadirkan Inovasi PLTSa Merah Putih Bantargebang, Solusi Atasi Timbunan Sampah di Kota Besar.\nhttp://sainsedutainment.blogspot.com/2011/10/pembangkit-listrik-tenaga-sampah-pltsa.html.\nNasution, D.M. 2011. Pengertian Menara Pendingin.\nhttp://repository.usu.ac.id/bitstream/123456789/22673/4/Chapter%20II.pdf.\nMathie, Alton J. 1988. Chemical Treatment For Cooling Water. Fairmont Press.\nQasim, Syed R. 1985. Wastewater Treatment Plants Planning, Desaign, and Operation. New York:CBS College Publishing.","PeriodicalId":192894,"journal":{"name":"JURNAL BHARA PETRO ENERGI","volume":"82 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2022-12-19","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"JURNAL BHARA PETRO ENERGI","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.31599/bpe.v1i3.1720","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

The Garbage Power Plant (PLTSa) has a water cycle in which heat transfer occurs in the cooling tower. This study looked for the pH level of the hot ratio using samples from hydrochloric acid (HCl) tanks and cooling tower (CT) output water samples. The results obtained by several comparisons of testing and analysis were obtained by 3.6 Liters of adding hydrochloric acid (HCl) to the tank so that the heat transfer that runs on the cooling tower has a pH level of 7. If the pH level is already 7 the possibility for acids or bases to be small and can preventing and maintaining heat transfer flows.process. Keywords: Cooling tower, hydrochloric acid, calculation analysis, PLTSa Reference: Akbar. 2014. Pembangkit Listrik Tenaga Sampah. http://makassargreen.blogspot.co.id/2014/03/pembangkit-listrik-tenaga sampah.html. Badan Penerapan dan Pengkajian Teknologi. (2019). BPPT Hadirkan Inovasi PLTSa Merah Putih Bantargebang, Solusi Atasi Timbunan Sampah di Kota Besar. Jakarta: Badan Penerapan dan Pengkajian Teknologi. Diambil dari BADAN PENGKAJIAN DAN PENERAPAN TEKNOLOGI - BPPT Hadirkan Inovasi PLTSa Merah Putih Bantargebang, Solusi Atasi Timbunan Sampah di Kota Besar. http://sainsedutainment.blogspot.com/2011/10/pembangkit-listrik-tenaga-sampah-pltsa.html. Nasution, D.M. 2011. Pengertian Menara Pendingin. http://repository.usu.ac.id/bitstream/123456789/22673/4/Chapter%20II.pdf. Mathie, Alton J. 1988. Chemical Treatment For Cooling Water. Fairmont Press. Qasim, Syed R. 1985. Wastewater Treatment Plants Planning, Desaign, and Operation. New York:CBS College Publishing.
分析盐酸(HCl)作为核电站冷水冷却塔的pH控制器(PLTSa)
垃圾发电厂(PLTSa)有一个水循环,其中热量传递发生在冷却塔中。本研究利用盐酸(HCl)罐和冷却塔(CT)输出水样寻找热比的pH值。通过向罐中加入3.6升盐酸(HCl),使在冷却塔上运行的传热pH值为7,得到了多次测试和分析比较的结果。如果pH值已经为7,则酸或碱的可能性很小,可以阻止和维持换热流动。过程。关键词:冷却塔,盐酸,计算分析,plts3参考文献:阿克巴。2014. Pembangkit Listrik Tenaga sampahttp://makassargreen.blogspot.co。id/2014/03/pembangkit-listrik-tenaga sampah.html.Badan Penerapan dan Pengkajian Teknologi。(2019)。我是说,我是说,我是说,我是说,我是说,我是说,我是说。雅加达:Badan Penerapan dan Pengkajian teknologii。王晓明,王晓明,王晓明。2011.大连理工大学学报(自然科学版)。penertian Menara pending.org .http://repository.usu.ac.id/bitstream/123456789/22673/4/Chapter%20II.pdf。阿尔顿·马蒂,1988。冷却水的化学处理。费尔蒙特出版社。卡西姆,赛义德R. 1985。污水处理厂规划,设计和操作。纽约:哥伦比亚广播公司学院出版社。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信