RESEARCH OF THE EFFICIENCY OF USING «GEOVIA SURPAC» AND «MINESCHED» WHEN PLANNING MINING WORKS IN IRON QUARRY

B. Sobko, O. Lozhnikov, V. Tretyakov
{"title":"RESEARCH OF THE EFFICIENCY OF USING «GEOVIA SURPAC» AND «MINESCHED» WHEN PLANNING MINING WORKS IN IRON QUARRY","authors":"B. Sobko, O. Lozhnikov, V. Tretyakov","doi":"10.31474/2073-9575-2021-1(25)-2(26)-7-15","DOIUrl":null,"url":null,"abstract":"Purpose. Investigate and compare monthly mine planning method using Geovia Surpac and MineSched software. Methods. The computerized research method was used to create a scenario of mining operations in Geovia software for planning monthly operations in the open pit of LLC Eristovsky MPP. Results. It was confirmed that the new software make possible to plan the extraction of ore minerals for a certain period, with the possibility of uniform supply of the concentration plant with ore minerals of the required quality. Also, it became possible to analyze in detail the extraction of minerals from the contours of the open pit and clear production control in the working contours. Scientific novelty. The dependences of the given productivity of mining equipment on the parameters of the mining system elements were established using the MineSched software. The effectiveness of determining the quality of mining minerals is established, when planning for a longer period of time using computer programs in comparison with the old method. The economic benefits of using new software with broader functionality are determined. Practical significance. A new method of planning the ore mass extraction is proposed, which made it possible to supply minerals from the pit with average quality indicators. This contributed to a more efficient product enrichment, which in turn reduced production costs. Also by the new software it was possible to reduce the time for planning mining operations, which led to a decrease in working time to complete the task and, accordingly, reduced the cost of computing operations. Keywords: pit, geological block model, monthly mining plan, Surpac software, Minesched software, batch plan.","PeriodicalId":430946,"journal":{"name":"SCIENTIFIC PAPERS OF DONNTU Series: “The Mining and Geology”","volume":"5 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"1900-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"SCIENTIFIC PAPERS OF DONNTU Series: “The Mining and Geology”","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.31474/2073-9575-2021-1(25)-2(26)-7-15","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

Purpose. Investigate and compare monthly mine planning method using Geovia Surpac and MineSched software. Methods. The computerized research method was used to create a scenario of mining operations in Geovia software for planning monthly operations in the open pit of LLC Eristovsky MPP. Results. It was confirmed that the new software make possible to plan the extraction of ore minerals for a certain period, with the possibility of uniform supply of the concentration plant with ore minerals of the required quality. Also, it became possible to analyze in detail the extraction of minerals from the contours of the open pit and clear production control in the working contours. Scientific novelty. The dependences of the given productivity of mining equipment on the parameters of the mining system elements were established using the MineSched software. The effectiveness of determining the quality of mining minerals is established, when planning for a longer period of time using computer programs in comparison with the old method. The economic benefits of using new software with broader functionality are determined. Practical significance. A new method of planning the ore mass extraction is proposed, which made it possible to supply minerals from the pit with average quality indicators. This contributed to a more efficient product enrichment, which in turn reduced production costs. Also by the new software it was possible to reduce the time for planning mining operations, which led to a decrease in working time to complete the task and, accordingly, reduced the cost of computing operations. Keywords: pit, geological block model, monthly mining plan, Surpac software, Minesched software, batch plan.
在铁矿采石场规划采矿工程时,采用“geovia surpac”和“minesched”的效率研究
目的。利用Geovia Surpac和MineSched软件对月度矿山规划方法进行调查和比较。方法。采用计算机化研究方法,在Geovia软件中创建采矿作业场景,以规划LLC Eristovsky MPP露天矿每月的作业。结果。经证实,新的软件可以在一定时期内规划矿石的提取,并有可能均匀地向选矿厂提供所需质量的矿石。此外,还可以详细分析从露天矿轮廓中提取矿物的情况,并明确工作轮廓中的生产控制。科学的新奇。利用MineSched软件建立了给定采矿设备生产率与采矿系统要素参数的依赖关系。与旧方法相比,在进行较长时间的计划时,使用计算机程序确定采矿矿物质量的有效性得到了证实。使用具有更广泛功能的新软件的经济效益是确定的。现实意义。提出了一种新的矿体开采规划方法,使从矿坑中供应质量指标平均的矿石成为可能。这有助于更有效地富集产品,从而降低生产成本。此外,新软件还可以减少规划采矿作业的时间,从而减少完成任务的工作时间,从而降低计算作业的成本。关键词:矿坑,地块模型,月采计划,Surpac软件,Minesched软件,批采计划
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信