{"title":"Key success factors of a regional software process improvement programme","authors":"M. Lepasaar, A. Kalja, T. Varkoi, H. Jaakkola","doi":"10.1109/PICMET.2001.952341","DOIUrl":null,"url":null,"abstract":"This article views the situation of software process improvement (SPI) activities in two neighbouring European countries, Estonia and Finland, with the aim to point out the prerequisites of a country prior to implementing the SPI activities. The authors compare SPI activities in Finland and Estonia and analyse the reasons for the differences in the two countries. Through a comparison of the SPICE related SPI activities, the necessary prerequisites are derived which a country should fulfil prior to the implementation of SPI. After reading this article, the reader should have an idea about what needs to be done before successful implementation of a software process improvement programme.","PeriodicalId":117603,"journal":{"name":"PICMET '01. Portland International Conference on Management of Engineering and Technology. Proceedings Vol.1: Book of Summaries (IEEE Cat. No.01CH37199)","volume":"79 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2001-07-29","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"5","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"PICMET '01. Portland International Conference on Management of Engineering and Technology. Proceedings Vol.1: Book of Summaries (IEEE Cat. No.01CH37199)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/PICMET.2001.952341","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 5
Abstract
This article views the situation of software process improvement (SPI) activities in two neighbouring European countries, Estonia and Finland, with the aim to point out the prerequisites of a country prior to implementing the SPI activities. The authors compare SPI activities in Finland and Estonia and analyse the reasons for the differences in the two countries. Through a comparison of the SPICE related SPI activities, the necessary prerequisites are derived which a country should fulfil prior to the implementation of SPI. After reading this article, the reader should have an idea about what needs to be done before successful implementation of a software process improvement programme.