Planning and scheduling in a flexible manufacturing system using a dynamic routing method for automated guided vehicles

Pei-Sen Liu, L. Fu
{"title":"Planning and scheduling in a flexible manufacturing system using a dynamic routing method for automated guided vehicles","authors":"Pei-Sen Liu, L. Fu","doi":"10.1109/ROBOT.1989.100204","DOIUrl":null,"url":null,"abstract":"An approach that can dynamically solve the planning and scheduling problem in a flexible manufacturing system (FMS) is presented. This problem is formulated as the determination of an optimal routing assignment of p automated guided vehicles among m workstations in order to accomplish N tasks in an FMS. A useful task representation called workgraph is introduced to facilitate the latter computation; then the A* search algorithm, the minimax criterion, and source heuristic rules are used to solve this routing assignment problem dynamically. The approach obtains a near-optimal solution in moderate computation time, and, in addition, solves some dynamic situations so as to make the FMS more flexible.<<ETX>>","PeriodicalId":114394,"journal":{"name":"Proceedings, 1989 International Conference on Robotics and Automation","volume":"105 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"1989-05-14","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"22","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Proceedings, 1989 International Conference on Robotics and Automation","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/ROBOT.1989.100204","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 22

Abstract

An approach that can dynamically solve the planning and scheduling problem in a flexible manufacturing system (FMS) is presented. This problem is formulated as the determination of an optimal routing assignment of p automated guided vehicles among m workstations in order to accomplish N tasks in an FMS. A useful task representation called workgraph is introduced to facilitate the latter computation; then the A* search algorithm, the minimax criterion, and source heuristic rules are used to solve this routing assignment problem dynamically. The approach obtains a near-optimal solution in moderate computation time, and, in addition, solves some dynamic situations so as to make the FMS more flexible.<>
柔性制造系统中自动导向车辆动态路径的规划与调度
提出了一种柔性制造系统(FMS)中动态求解计划调度问题的方法。该问题被表述为在FMS中为完成N个任务,在m个工作站中确定p辆自动引导车辆的最优路径分配。为了便于后期的计算,引入了一种有用的任务表示形式——工作图;然后利用A*搜索算法、极大极小准则和源启发式规则动态求解该路由分配问题。该方法在适度的计算时间内获得了近似最优解,并解决了一些动态情况,使FMS具有更大的灵活性。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信