{"title":"Replacement of existing ground wire with OPGW under live-line conditions new training polygon in Olsztyn","authors":"G. Kochan, K. Lenarczyk, K. Kiczkajlo, B. Dudek","doi":"10.1109/ICOLIM.2014.6934332","DOIUrl":null,"url":null,"abstract":"Replacement of existing ground wires with OPGW under live-line conditions. This paper describes methods and examples of building fibre optics tract by different existing and actual methods on energized transmission line abroad and in Poland. In addition, an analysis of electromagnetic field induction from existing and nearby energized line when OPGW is being installed is presented. The paper also presents a newly built training polygon in Olsztyn for secure operation practice.","PeriodicalId":238060,"journal":{"name":"2014 11th International Conference on Live Maintenance (ICOLIM)","volume":"46 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2014-05-21","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"3","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"2014 11th International Conference on Live Maintenance (ICOLIM)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/ICOLIM.2014.6934332","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 3

Abstract

Replacement of existing ground wires with OPGW under live-line conditions. This paper describes methods and examples of building fibre optics tract by different existing and actual methods on energized transmission line abroad and in Poland. In addition, an analysis of electromagnetic field induction from existing and nearby energized line when OPGW is being installed is presented. The paper also presents a newly built training polygon in Olsztyn for secure operation practice.
在联机条件下用OPGW替换现有接地线,在Olsztyn新建训练多边形
在带电条件下用OPGW替换现有地线。本文介绍了国外和波兰在通电输电线路上采用不同的现有和实际方法建设光纤束的方法和实例。此外,还分析了OPGW安装过程中既有和附近带电线路的电磁场感应。本文还介绍了在Olsztyn中新建的用于安全操作实践的训练多边形。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信