Landing gear steer-by-wire control system; digital vs. analog study

L. Dacko, R. Darlington, D. Shindman
{"title":"Landing gear steer-by-wire control system; digital vs. analog study","authors":"L. Dacko, R. Darlington, D. Shindman","doi":"10.1109/ARMS.1990.67959","DOIUrl":null,"url":null,"abstract":"A worthiness study in which the digital steer-by-wire control system was compared to an analog one using the life-cycle cost procedure is presented. The purpose of the study was to determine whether the higher reliability, ease of test, decrease in maintenance cost, and lower delay and cancellation rates foreseen for the digital system were worth increased recurring and nonrecurring costs. A potential drawback is the cost of the software development and certification. It is strongly influenced by proper programming techniques and good definition of requirements. The life-cycle cost analysis has shown that it is advantageous to make a large initial investment in technology that will be paid back over the life of the system.<<ETX>>","PeriodicalId":383597,"journal":{"name":"Annual Proceedings on Reliability and Maintainability Symposium","volume":"5 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"1990-01-23","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"2","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Annual Proceedings on Reliability and Maintainability Symposium","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/ARMS.1990.67959","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 2

Abstract

A worthiness study in which the digital steer-by-wire control system was compared to an analog one using the life-cycle cost procedure is presented. The purpose of the study was to determine whether the higher reliability, ease of test, decrease in maintenance cost, and lower delay and cancellation rates foreseen for the digital system were worth increased recurring and nonrecurring costs. A potential drawback is the cost of the software development and certification. It is strongly influenced by proper programming techniques and good definition of requirements. The life-cycle cost analysis has shown that it is advantageous to make a large initial investment in technology that will be paid back over the life of the system.<>
起落架线控操纵系统;数字与模拟研究
采用全寿命周期成本法对数字线控控制系统与模拟线控控制系统进行了比较。该研究的目的是确定数字系统更高的可靠性、易于测试、降低维护成本、降低延迟和取消率是否值得增加经常性和非经常性成本。一个潜在的缺点是软件开发和认证的成本。它受到适当的编程技术和良好的需求定义的强烈影响。生命周期成本分析表明,在技术上进行大量的初始投资是有利的,这些投资将在系统的生命周期内得到回报。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信