Day-ahead and online scheduling of a Power Park in urban electricity infrastructure

E. Abbasi, H. Ameli, K. Strunz
{"title":"Day-ahead and online scheduling of a Power Park in urban electricity infrastructure","authors":"E. Abbasi, H. Ameli, K. Strunz","doi":"10.1109/ISGTEurope.2012.6465635","DOIUrl":null,"url":null,"abstract":"The hybrid wind-photovoltaic Power Park proposed in this paper is designed to perform multiple tasks while using renewable energies as the principle resources. Even though the renewable energy sources are intermittent and volatile, thanks to the battery energy storage system integrated in the Power Park, it is possible to attain deterministic power exchanges with the grid by an optimized scheduling and online operation strategy. Battery storage is integrated in the Power Park for renewable energy management, providing uninterruptible power supply, probably deferring some network upgrades, fast charging of electrical vehicles, and enhancing the value of the electricity generated by time-shifting delivery to the grid in a smart grid environment. In this paper, it is shown that the Power Park can be scheduled optimally for the mentioned multiple applications. An optimized scheduling program for the designed Power Park is formulated. An online scheduling strategy for the Power Park is also developed. Numerical results justify effectiveness of the developed methods.","PeriodicalId":244881,"journal":{"name":"2012 3rd IEEE PES Innovative Smart Grid Technologies Europe (ISGT Europe)","volume":"17 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2012-10-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"2012 3rd IEEE PES Innovative Smart Grid Technologies Europe (ISGT Europe)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/ISGTEurope.2012.6465635","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 1

Abstract

The hybrid wind-photovoltaic Power Park proposed in this paper is designed to perform multiple tasks while using renewable energies as the principle resources. Even though the renewable energy sources are intermittent and volatile, thanks to the battery energy storage system integrated in the Power Park, it is possible to attain deterministic power exchanges with the grid by an optimized scheduling and online operation strategy. Battery storage is integrated in the Power Park for renewable energy management, providing uninterruptible power supply, probably deferring some network upgrades, fast charging of electrical vehicles, and enhancing the value of the electricity generated by time-shifting delivery to the grid in a smart grid environment. In this paper, it is shown that the Power Park can be scheduled optimally for the mentioned multiple applications. An optimized scheduling program for the designed Power Park is formulated. An online scheduling strategy for the Power Park is also developed. Numerical results justify effectiveness of the developed methods.
城市电力基础设施发电园区日前在线调度研究
本文提出的混合风-光伏发电园区以可再生能源为主要资源,同时兼顾多种任务。尽管可再生能源具有间歇性和不稳定性,但由于电力园区集成了电池储能系统,通过优化调度和在线运行策略,可以实现与电网的确定性电力交换。电池存储集成在电力园区用于可再生能源管理,提供不间断电力供应,可能推迟一些网络升级,电动汽车快速充电,并在智能电网环境中通过时变输送到电网来提高电力的价值。本文的研究表明,对于上述多种应用,电力园区可以进行最优调度。对设计的电力园区制定了优化调度方案。提出了电力园区在线调度策略。数值结果证明了所提出方法的有效性。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信