The testing methodologies of service aged medium voltage power cables as applied to an operating wind farm

M. Moore
{"title":"The testing methodologies of service aged medium voltage power cables as applied to an operating wind farm","authors":"M. Moore","doi":"10.1109/EIC.2011.5996191","DOIUrl":null,"url":null,"abstract":"As wind turbines quickly spread throughout the USA, many wind generation sites were designed, developed and installed very quickly and not always with long term dependability in mind. This review of cable testing methods used in both acceptance testing and annual maintenance practices will discuss the strengths and weaknesses of the various methodologies in wind farm applications. Also discussed will be a method for a time based approach to cable maintenance testing and how to develop standards and qualify personnel for the procedures.","PeriodicalId":129127,"journal":{"name":"2011 Electrical Insulation Conference (EIC).","volume":"50 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2011-06-05","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"3","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"2011 Electrical Insulation Conference (EIC).","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/EIC.2011.5996191","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 3

Abstract

As wind turbines quickly spread throughout the USA, many wind generation sites were designed, developed and installed very quickly and not always with long term dependability in mind. This review of cable testing methods used in both acceptance testing and annual maintenance practices will discuss the strengths and weaknesses of the various methodologies in wind farm applications. Also discussed will be a method for a time based approach to cable maintenance testing and how to develop standards and qualify personnel for the procedures.
应用于运行中的风电场的服役老化中压电力电缆的测试方法
随着风力涡轮机在美国的迅速普及,许多风力发电站的设计、开发和安装都非常迅速,而且并不总是考虑到长期的可靠性。本文回顾了在验收测试和年度维护实践中使用的电缆测试方法,讨论了各种方法在风电场应用中的优缺点。此外,还将讨论一种基于时间的电缆维护测试方法,以及如何制定标准和对程序人员进行资格认证。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信