{"title":"Assessment Method of Continuity Key Activities in Air Transport","authors":"D. Rozová, R. Sousek, V. Němec","doi":"10.1109/NTAD.2019.8875605","DOIUrl":null,"url":null,"abstract":"The key theme of business continuity is to find ways to dampen or strengthen activities that will allow the continuation of air transport while addressing the emergency. Risk and impact analysis for the business continuity of air transport defines activities that enable the objectives to be met and key business continuity services and products identified by the airline. These would have the greatest impact on the airline's function in the event of a disruption. Using award-winning continuity activities, it is possible to perform more accurate impact analyzes, which is an important stage in the process of implementing the Business Continuity Management System (BCMS).","PeriodicalId":186247,"journal":{"name":"2019 New Trends in Aviation Development (NTAD)","volume":"115 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2019-09-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"2019 New Trends in Aviation Development (NTAD)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/NTAD.2019.8875605","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0
Abstract
The key theme of business continuity is to find ways to dampen or strengthen activities that will allow the continuation of air transport while addressing the emergency. Risk and impact analysis for the business continuity of air transport defines activities that enable the objectives to be met and key business continuity services and products identified by the airline. These would have the greatest impact on the airline's function in the event of a disruption. Using award-winning continuity activities, it is possible to perform more accurate impact analyzes, which is an important stage in the process of implementing the Business Continuity Management System (BCMS).