IMPLEMENTASI PENGELOLAAN DANA BANTUAN OPERASIONAL SEKOLAH DI SMPIT HIDAYAH KLATEN

Steelyana Indria Sari, Ravi Suci Saputro
{"title":"IMPLEMENTASI PENGELOLAAN DANA BANTUAN OPERASIONAL SEKOLAH DI SMPIT HIDAYAH KLATEN","authors":"Steelyana Indria Sari, Ravi Suci Saputro","doi":"10.51878/secondary.v3i2.2242","DOIUrl":null,"url":null,"abstract":"This study was describe management implementation of The School Operational Assistance Fund (BOS) in SMPIT Hidayah Klaten. The data collection was done through observation, interview and documentation study. The data analysis used in this study were data reduction, data presentation, and conclusion drawing. The result show that 1) the planning, implementation, supervision, and reporting process of Dana BOS management in SMPIT Hidayah Klaten in 2020 has run well according to the technical guidelines of Permendikbu (Ministerial Regulation of Education and Culture) Number 8 of 2020, 2) the obstacles in managing Dana BOS in SMPIT Hidayah Klaten were the disbursement of funds was often delayed and there were also regulation changes in the School Operational Assistance Management. The efforts undergone to overcome the obstacles were done by the management team in SMPIT Hidayah Klaten who have to borrow loans from the corporate partner and related to the changes in the government regulations, the financial management team re-compile LPJ (the accountability report) according to the new Permendikbud technical instructions.\nABSTRAKPenelitian ini deskriptif implementasi pengelolaan dana bantuan operasional sekolah di SMPIT Hidayah Klaten. Teknik pengumpulan data dilakukan melalui observasi, wawancara dan studi dokumentasi. Teknik analisis data yang digunakan yaitu reduksi data, penyajian data, dan penarikan kesimpulan. Hasil penelitian menunjukkan bahwa 1) Proses Perencanaan, Pelaksanaan, Pengawasan, dan Pelaporan Pengelolaan Dana BOS di SMPIT Hidayah Klaten telah berjalan dengan baik sesuai dengan petunjuk teknis Peraturan Menteri Pendidikan dan Kebudayaan (Permendikbud) Nomor 8 Tahun 2020, 2) Kendala pengelolaan dana BOS di SMPIT Hidayah Klaten yaitu waktu pencairan dana sering mengalami keterlambatan dan juga terdapat perubahan peraturan pengelolaan dana BOS. Upaya mengatasi kendala dilakukan bon di tempat rekanan yang sudah diajak kerjasama dan terkait perubahan aturan pemerintah, tim pengelolaan keuangan dana BOS melakukan penyusunan laporan pertanggungjawaban (LPJ) ulang sesuai dengan petunjuk teknis Permendikbud yang baru.","PeriodicalId":369099,"journal":{"name":"SECONDARY: Jurnal Inovasi Pendidikan Menengah","volume":"45 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2023-06-15","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"SECONDARY: Jurnal Inovasi Pendidikan Menengah","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.51878/secondary.v3i2.2242","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

This study was describe management implementation of The School Operational Assistance Fund (BOS) in SMPIT Hidayah Klaten. The data collection was done through observation, interview and documentation study. The data analysis used in this study were data reduction, data presentation, and conclusion drawing. The result show that 1) the planning, implementation, supervision, and reporting process of Dana BOS management in SMPIT Hidayah Klaten in 2020 has run well according to the technical guidelines of Permendikbu (Ministerial Regulation of Education and Culture) Number 8 of 2020, 2) the obstacles in managing Dana BOS in SMPIT Hidayah Klaten were the disbursement of funds was often delayed and there were also regulation changes in the School Operational Assistance Management. The efforts undergone to overcome the obstacles were done by the management team in SMPIT Hidayah Klaten who have to borrow loans from the corporate partner and related to the changes in the government regulations, the financial management team re-compile LPJ (the accountability report) according to the new Permendikbud technical instructions. ABSTRAKPenelitian ini deskriptif implementasi pengelolaan dana bantuan operasional sekolah di SMPIT Hidayah Klaten. Teknik pengumpulan data dilakukan melalui observasi, wawancara dan studi dokumentasi. Teknik analisis data yang digunakan yaitu reduksi data, penyajian data, dan penarikan kesimpulan. Hasil penelitian menunjukkan bahwa 1) Proses Perencanaan, Pelaksanaan, Pengawasan, dan Pelaporan Pengelolaan Dana BOS di SMPIT Hidayah Klaten telah berjalan dengan baik sesuai dengan petunjuk teknis Peraturan Menteri Pendidikan dan Kebudayaan (Permendikbud) Nomor 8 Tahun 2020, 2) Kendala pengelolaan dana BOS di SMPIT Hidayah Klaten yaitu waktu pencairan dana sering mengalami keterlambatan dan juga terdapat perubahan peraturan pengelolaan dana BOS. Upaya mengatasi kendala dilakukan bon di tempat rekanan yang sudah diajak kerjasama dan terkait perubahan aturan pemerintah, tim pengelolaan keuangan dana BOS melakukan penyusunan laporan pertanggungjawaban (LPJ) ulang sesuai dengan petunjuk teknis Permendikbud yang baru.
实施了sdayah KLATEN学校业务援助管理管理
本研究描述希达亚克拉丹省SMPIT学校运作援助基金(BOS)的管理实施情况。数据收集采用观察法、访谈法和文献研究法。本研究的数据分析采用数据缩减、数据呈现和结论绘制。结果表明:1)根据2020年教育和文化部级条例(Permendikbu)第8号的技术指导方针,2020年希达亚克拉丹SMPIT Dana BOS管理的规划、实施、监督和报告过程运行良好;2)希达亚克拉丹SMPIT Dana BOS管理的障碍是资金的支付经常延迟,学校运营援助管理也有法规变化。SMPIT Hidayah Klaten的管理团队为克服这些障碍所做的努力,他们必须向公司合作伙伴借款,并且由于政府法规的变化,财务管理团队根据新的Permendikbud技术说明重新编制了LPJ(问责报告)。摘要/ abstract摘要:在SMPIT Hidayah Klaten中,penelitian ini桌面脚本的实现是一种可操作的数据集。日本气象台,日本气象台,日本气象台,日本气象台,日本气象台,日本气象台。Teknik分析数据杨迪纳纳坎yitu reduksi数据,彭亚健数据,丹彭亚健kespulan。1)翻译perencanan, Pelaksanaan, Pengawasan, danpelaporan penelolaan Dana BOS di SMPIT Hidayah klatah berjalan dengan baik sesuai dengan petunjuk teknis Peraturan Menteri Pendidikan dan Kebudayaan (permendikbudi) no or 8 Tahun 2020, 2) Kendala Pengelolaan Dana sering mengalami keterlambatan dan juga terdapat perubahan Peraturan penelolaan Dana BOS我的意思是,我的意思是,我的意思是,我的意思是,我的意思是,我的意思是,我的意思是,我的意思是,我的意思是,我的意思是,我的意思是,我的意思是,我的意思是,我的意思是,我的意思是,我的意思是,我的意思是,我的意思是,我的意思是,我的意思是,我的意思是,我的意思是,我的意思是,我的意思是。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信