{"title":"Multiobjective Optimization of Production Line Supply Based on Maximum Endurance Time and Rest Allowance","authors":"Sezen Korkulu, K. Bóna","doi":"10.1007/978-981-33-4359-7_60","DOIUrl":null,"url":null,"abstract":"","PeriodicalId":129343,"journal":{"name":"LISS 2020","volume":"1 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"1900-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"LISS 2020","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1007/978-981-33-4359-7_60","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}