Dynamic Iteration Method: New Approach to Cultural Events Management

E. Šviráková
{"title":"Dynamic Iteration Method: New Approach to Cultural Events Management","authors":"E. Šviráková","doi":"10.46300/91015.2021.15.16","DOIUrl":null,"url":null,"abstract":"This article provides project managers, the cultural events organizers, a new approach to plan preparation and to the monitoring of events realization. The Dynamic Iteration Method introduced in this article is based on the system dynamic modelling and on the principles of project iterative development. The plan model and the reality model are structurally similar; they differ in values of exogenous variables. The new approach enables to easily monitor the real project course in close connection with the plan and to take timely controlling steps. The effects resulting from the manager´s decisionmaking process are compared with the plan in regular iterations. The method thus reminds of a traveller whose route is adjusted by a GPS navigation system.","PeriodicalId":158702,"journal":{"name":"International Journal of Systems Applications, Engineering & Development","volume":"11 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2021-11-26","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"International Journal of Systems Applications, Engineering & Development","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.46300/91015.2021.15.16","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

This article provides project managers, the cultural events organizers, a new approach to plan preparation and to the monitoring of events realization. The Dynamic Iteration Method introduced in this article is based on the system dynamic modelling and on the principles of project iterative development. The plan model and the reality model are structurally similar; they differ in values of exogenous variables. The new approach enables to easily monitor the real project course in close connection with the plan and to take timely controlling steps. The effects resulting from the manager´s decisionmaking process are compared with the plan in regular iterations. The method thus reminds of a traveller whose route is adjusted by a GPS navigation system.
动态迭代法:文化事件管理的新途径
本文为项目经理、文化活动组织者提供了一种规划准备和活动实现监控的新方法。本文介绍的动态迭代方法是基于系统动态建模和项目迭代开发的原理。计划模型与现实模型在结构上相似;它们不同于外生变量的值。该方法可以方便地监控与计划密切相关的实际项目过程,并及时采取控制步骤。在常规迭代中,将管理者的决策过程所产生的效果与计划进行比较。因此,这种方法让人想起了通过GPS导航系统调整路线的旅行者。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信