Analysis Of Railroad Reactivation On Traffic In The Babat-Jombang Road

Zoya Aurora Putri Sulaiman, S. Mudjanarko
{"title":"Analysis Of Railroad Reactivation On Traffic In The Babat-Jombang Road","authors":"Zoya Aurora Putri Sulaiman, S. Mudjanarko","doi":"10.29138/prd.v2i1.135","DOIUrl":null,"url":null,"abstract":"The train is a mode of transportation that has many advantages. Already the supposed superiority used optimally ensure the movement of people and goods, This study uses a quantitative research. The analyzes were performed using the method of shock waves, based on Level of Service (Los) the degree of saturation in the biggest roadway there on days 1 and 2 towards Jombang-Babat at 8:00 to 9:00 pm at 0:26 into the category B where the value is less than the limit traffic density (0.26 <1). In the segment occurs queue as far as 624 meters long with 85 queues of vehicles takes time for 300 seconds from the start of the closing latch until the vehicle can run normally.","PeriodicalId":386863,"journal":{"name":"Journal of World Conference (JWC)","volume":"48 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2019-08-03","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Journal of World Conference (JWC)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.29138/prd.v2i1.135","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

The train is a mode of transportation that has many advantages. Already the supposed superiority used optimally ensure the movement of people and goods, This study uses a quantitative research. The analyzes were performed using the method of shock waves, based on Level of Service (Los) the degree of saturation in the biggest roadway there on days 1 and 2 towards Jombang-Babat at 8:00 to 9:00 pm at 0:26 into the category B where the value is less than the limit traffic density (0.26 <1). In the segment occurs queue as far as 624 meters long with 85 queues of vehicles takes time for 300 seconds from the start of the closing latch until the vehicle can run normally.
Babat-Jombang公路铁路复垦对交通的影响分析
火车是一种有许多优点的交通方式。本研究采用了定量研究的方法,充分保证了人员和货物的流动。以服务水平(Los)为基础,采用激波分析方法,将第1、2天晚上8:00 ~ 9:00(0:26)朝仲帮-巴巴特方向最大道路的饱和程度划分为小于限制交通密度(0.26 <1)的B类。在该段发生了长达624米的队列,共85辆车,从闭锁开始到车辆正常运行需要300秒的时间。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信