Optimization on the shop floor - A business simulation Approach

{"title":"Optimization on the shop floor - A business simulation Approach","authors":"","doi":"10.46254/j.ieom.20200103","DOIUrl":null,"url":null,"abstract":"Assembly processes can be optimized with various methods. However, it is difficult\nto evaluate the effectiveness and interaction of these methods. To date, shop floor\nimprovement methods in series production, such as the methods under investigation\n5S, Poka Yoke, Kanban, and Standard Work Sheet, have not been scientifically\nanalyzed using a business simulation. This study is aimed at closing this research gap\nby conducting a business simulation and analyzing the generated data using the design\nof experiments. This combination represents a new form of research. For the design\nof experiments, full factorial design with four factors was used. Lead time is selected\nas the KPI. By analyzing the lean methods that were investigated in this study, both\nmain effects and interactions were found. Results show that it is useful to apply at\nleast one optimization method, whereby Poka Yoke has the most significant impact\non the lead time. Researchers in the field of optimization methods can base their\ninvestigations on this study.","PeriodicalId":268888,"journal":{"name":"International Journal of Industrial Engineering and Operations Management","volume":"144 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2020-10-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"International Journal of Industrial Engineering and Operations Management","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.46254/j.ieom.20200103","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

Assembly processes can be optimized with various methods. However, it is difficult to evaluate the effectiveness and interaction of these methods. To date, shop floor improvement methods in series production, such as the methods under investigation 5S, Poka Yoke, Kanban, and Standard Work Sheet, have not been scientifically analyzed using a business simulation. This study is aimed at closing this research gap by conducting a business simulation and analyzing the generated data using the design of experiments. This combination represents a new form of research. For the design of experiments, full factorial design with four factors was used. Lead time is selected as the KPI. By analyzing the lean methods that were investigated in this study, both main effects and interactions were found. Results show that it is useful to apply at least one optimization method, whereby Poka Yoke has the most significant impact on the lead time. Researchers in the field of optimization methods can base their investigations on this study.
车间优化——一种商业模拟方法
装配过程可以用各种方法进行优化。然而,很难评估这些方法的有效性和相互作用。到目前为止,在批量生产中的车间改进方法,如正在调查的5s、Poka Yoke、看板和标准工作表等方法,还没有通过商业模拟进行科学的分析。本研究旨在通过进行商业模拟和使用实验设计分析生成的数据来弥补这一研究空白。这种结合代表了一种新的研究形式。试验设计采用四因素全因子设计。交货期被选为KPI。通过分析本研究研究的精益方法,发现了主要效应和相互作用。结果表明,至少应用一种优化方法是有用的,其中Poka Yoke对交货期的影响最为显著。优化方法领域的研究人员可以在此基础上进行研究。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信