Kuwait Environmental Remediation Program - North Kuwait Excavation, Transportation & Remediation Zone II

Muthanna Almumin, Meshari Albader, Aisha Al-Baroud
{"title":"Kuwait Environmental Remediation Program - North Kuwait Excavation, Transportation & Remediation Zone II","authors":"Muthanna Almumin, Meshari Albader, Aisha Al-Baroud","doi":"10.11159/icepr23.133","DOIUrl":null,"url":null,"abstract":"- The United Nations Compensation Commission (UNCC) awarded numerous environmental claims to fund Remediation and Restoration of environmental damage caused during the Gulf War. Based on Decision 258, all claimant countries were required to establish a National Focal Point. Kuwait National Focal Point (KNFP) was established in 2006 to manage the Funds provided to Kuwait and to liaise with various Government Entities to ensure proper execution of the Kuwait Environmental Remediation Program. Based upon a Memorandum of Understanding signed in 2010 by Kuwait National Focal and Kuwait Oil Company (KOC), Kuwait Oil Company was entrusted with handling the works as stipulated in UNCC Claim Funds 5000259, 5000450 Elements 2&3, and 5000454. The original plan was to Construct 17 landfills and to Excavate and Transport 26 million cubic meters of Contaminates soil to the Landfills and Bio-Remediate residual low level Contamination. Kuwait Oil Company recommended a change in strategy to Kuwait National Focal Point intended to Maximize Treatment and Minimize landfill. As per the new strategy, Tenders were prepared to treat a minimum of 15.5 million cubic meters of contaminated soil and to landfill a maximum of 6 million cubic meters of the estimated remaining oil contaminated soil. Out of a total of eight contracts floated to the market, five contracts have completed preliminary works to assess the quantity and level of contamination, prepare the treatment areas and to conduct treatment trials. The purpose of this abstract is to shed light on the journey in developing a robust, flexible and attractive Contract and to highlight the achievements in the initial 17 months of work and commencement of full-scale soil treatment for one of the five Zones under North Kuwait Excavation, Transportation &","PeriodicalId":398088,"journal":{"name":"Proceedings of the 9th World Congress on New Technologies","volume":"196 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2023-08-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Proceedings of the 9th World Congress on New Technologies","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.11159/icepr23.133","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

- The United Nations Compensation Commission (UNCC) awarded numerous environmental claims to fund Remediation and Restoration of environmental damage caused during the Gulf War. Based on Decision 258, all claimant countries were required to establish a National Focal Point. Kuwait National Focal Point (KNFP) was established in 2006 to manage the Funds provided to Kuwait and to liaise with various Government Entities to ensure proper execution of the Kuwait Environmental Remediation Program. Based upon a Memorandum of Understanding signed in 2010 by Kuwait National Focal and Kuwait Oil Company (KOC), Kuwait Oil Company was entrusted with handling the works as stipulated in UNCC Claim Funds 5000259, 5000450 Elements 2&3, and 5000454. The original plan was to Construct 17 landfills and to Excavate and Transport 26 million cubic meters of Contaminates soil to the Landfills and Bio-Remediate residual low level Contamination. Kuwait Oil Company recommended a change in strategy to Kuwait National Focal Point intended to Maximize Treatment and Minimize landfill. As per the new strategy, Tenders were prepared to treat a minimum of 15.5 million cubic meters of contaminated soil and to landfill a maximum of 6 million cubic meters of the estimated remaining oil contaminated soil. Out of a total of eight contracts floated to the market, five contracts have completed preliminary works to assess the quantity and level of contamination, prepare the treatment areas and to conduct treatment trials. The purpose of this abstract is to shed light on the journey in developing a robust, flexible and attractive Contract and to highlight the achievements in the initial 17 months of work and commencement of full-scale soil treatment for one of the five Zones under North Kuwait Excavation, Transportation &
科威特环境修复计划-北科威特挖掘,运输和修复II区
-联合国赔偿委员会(赔偿委员会)作出了许多环境索赔,以资助海湾战争期间造成的环境损害的补救和恢复。根据第258号决定,要求所有索赔国设立一个国家联络点。科威特国家协调中心(KNFP)成立于2006年,负责管理提供给科威特的资金,并与各政府实体保持联系,以确保科威特环境补救方案的适当执行。根据科威特国家中心和科威特石油公司(KOC)于2010年签署的谅解备忘录,科威特石油公司被委托处理UNCC索赔基金5000259,5000450要素2和3以及5000454规定的工程。原计划建设17个垃圾填埋场,挖掘运输污染土壤2600万立方米至垃圾填埋场,并对残留低水平污染进行生物修复。科威特石油公司向科威特国家协调中心建议改变战略,以最大限度地提高处理效率和减少垃圾填埋。根据新的战略,招标准备处理至少1550万立方米的污染土壤,并填埋最多600万立方米的估计剩余的石油污染土壤。在投放市场的八份合约中,有五份合约已完成初步工程,以评估污染的数量和程度、准备处理区域及进行处理试验。本摘要的目的是阐明在开发一个强大的,灵活的和有吸引力的合同的旅程,并强调在最初的17个月的工作和全面的土壤处理的开始为北科威特挖掘,运输和五个区域之一的成就
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信