{"title":"First Substation with IEC61850 Commissioned in the Americas","authors":"J. Rodrigues, L. Soldani, G. Wong","doi":"10.1109/TDCLA.2006.311500","DOIUrl":null,"url":null,"abstract":"The first substation in operation using IEC61850 in the Americas was Bujama of Luz del Sur in Peru. In this substation the standard was applied and fulfils all the requirements for substation automation. This paper describes this substation and the equipment","PeriodicalId":406067,"journal":{"name":"2006 IEEE/PES Transmission & Distribution Conference and Exposition: Latin America","volume":"35 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2006-08-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"8","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"2006 IEEE/PES Transmission & Distribution Conference and Exposition: Latin America","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/TDCLA.2006.311500","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 8
Abstract
The first substation in operation using IEC61850 in the Americas was Bujama of Luz del Sur in Peru. In this substation the standard was applied and fulfils all the requirements for substation automation. This paper describes this substation and the equipment