Cancelation of Saudi Aramco Investment in Cooperation to Develop the Oil Refinery in Cilacap

Fitrah Aisyah Adam
{"title":"Cancelation of Saudi Aramco Investment in Cooperation to Develop the Oil Refinery in Cilacap","authors":"Fitrah Aisyah Adam","doi":"10.4108/eai.14-9-2021.2321383","DOIUrl":null,"url":null,"abstract":". Indonesia through PT Pertamina and Saudi Aramco in 2016 officially started the negotiation process to form a joint venture for developing the Cilacap Refinery in Central Java which is Pertamina's Refinery Development Master Plan (RDMP). However, results from the negotiation efforts are not as expected investment from Aramco was canceled. Author's initial identification apart from economic factors, there are non- economic factors that affect the process. Therefore, this paper aims to analyze the cancellation of Saudi Aramco's investment in a joint venture with Pertamina for developing the oil refinery in Cilacap using the Political Bargaining Models. Moreover, this analysis hoped to reveal non-economic factors that affected the cancellation of the cooperation.","PeriodicalId":117433,"journal":{"name":"Proceedings of the 6th International Conference on Social and Political Enquiries, ICISPE 2021, 14-15 September 2021, Semarang, Indonesia","volume":"321 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"1900-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Proceedings of the 6th International Conference on Social and Political Enquiries, ICISPE 2021, 14-15 September 2021, Semarang, Indonesia","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.4108/eai.14-9-2021.2321383","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

. Indonesia through PT Pertamina and Saudi Aramco in 2016 officially started the negotiation process to form a joint venture for developing the Cilacap Refinery in Central Java which is Pertamina's Refinery Development Master Plan (RDMP). However, results from the negotiation efforts are not as expected investment from Aramco was canceled. Author's initial identification apart from economic factors, there are non- economic factors that affect the process. Therefore, this paper aims to analyze the cancellation of Saudi Aramco's investment in a joint venture with Pertamina for developing the oil refinery in Cilacap using the Political Bargaining Models. Moreover, this analysis hoped to reveal non-economic factors that affected the cancellation of the cooperation.
沙特阿拉伯国家石油公司(Saudi Aramco)取消了在Cilacap开发炼油厂的合作投资
. 印尼通过印尼国家石油公司(PT Pertamina)和沙特阿美公司(Saudi Aramco)于2016年正式启动谈判进程,组建一家合资企业,开发中爪哇的Cilacap炼油厂,这是印尼国家石油公司的炼油厂发展总体规划(RDMP)。然而,谈判努力的结果并没有像预期的那样,沙特阿美的投资被取消。笔者初步认定,除了经济因素外,还有非经济因素影响着这一过程。因此,本文旨在使用政治讨价还价模型来分析沙特阿美公司取消与Pertamina合资开发Cilacap炼油厂的投资。此外,本分析希望揭示影响合作取消的非经济因素。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信