Research on evaluation of engineering changes under bill of quantities mode

Tao Ding, Ling Zhang, Zhenshui Wang
{"title":"Research on evaluation of engineering changes under bill of quantities mode","authors":"Tao Ding, Ling Zhang, Zhenshui Wang","doi":"10.1109/WARTIA.2014.6976311","DOIUrl":null,"url":null,"abstract":"Engineering changes are not just critical evidences for engineering settlement between the two contracting parties in engineering construction, but also involve in the reallocation of responsibilities and risks such as laws, regulations, structural safety, technical standards, engineering scope, government acceptance, government supervision on quality and safety, health and epidemic prevention, planning, quality standards and fire control, etc. The feasibility evaluation on engineering changes under bill of quantities mode can better reflect its importance and necessity. Based on summary and review of a large number of examples of engineering changes, the thesis puts forward evaluation ideas and suggestions for engineering changes under bill of quantities mode, and hopes to provide certain instructions for management of subsequent engineering changes in the future.","PeriodicalId":288854,"journal":{"name":"2014 IEEE Workshop on Advanced Research and Technology in Industry Applications (WARTIA)","volume":"152 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2014-12-08","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"2014 IEEE Workshop on Advanced Research and Technology in Industry Applications (WARTIA)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/WARTIA.2014.6976311","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

Engineering changes are not just critical evidences for engineering settlement between the two contracting parties in engineering construction, but also involve in the reallocation of responsibilities and risks such as laws, regulations, structural safety, technical standards, engineering scope, government acceptance, government supervision on quality and safety, health and epidemic prevention, planning, quality standards and fire control, etc. The feasibility evaluation on engineering changes under bill of quantities mode can better reflect its importance and necessity. Based on summary and review of a large number of examples of engineering changes, the thesis puts forward evaluation ideas and suggestions for engineering changes under bill of quantities mode, and hopes to provide certain instructions for management of subsequent engineering changes in the future.
工程量清单计价模式下的工程变更评估研究
工程变更不仅是工程建设双方进行工程结算的重要依据,而且涉及法律法规、结构安全、技术标准、工程范围、政府验收、政府质量安全监管、卫生防疫、规划、质量标准、消防等责任和风险的再分配。工程量清单计价模式下的工程变更可行性评价更能体现其重要性和必要性。本文在对大量工程变更实例进行总结和回顾的基础上,提出工程量清单模式下工程变更的评价思路和建议,希望对今后后续工程变更的管理提供一定的指导。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信