Improvement of methods of calculation of transformation vnutrikletochnogo flood flow

S. Vasilenkov, V. Krovopuskova, Yuri Mazhayskiy
{"title":"Improvement of methods of calculation of transformation vnutrikletochnogo flood flow","authors":"S. Vasilenkov, V. Krovopuskova, Yuri Mazhayskiy","doi":"10.32962/0235-2524-2020-2-20-23","DOIUrl":null,"url":null,"abstract":"The purpose of the study is to develop a method for calculating flow schedules in the dams ‘ spillway structures, to consider the regularities of the flood flow transformation as a result of exceeding the inflow over the discharge of water into the pond. Given this process in the design of ponds, it is possible to reduce the maximum consumption and, accordingly, reduce the size of the spillway structures and their cost. The object of the study are ponds with small catchment areas, which are characterized by intra-day fluctuations in water flow due to intra-day fluctuations in air temperature and different rates of snow melting during the day. Most of the ponds in the Bryansk region are built on gullies, ravines, streams, very small rivers with small catchment areas, for which it is especially important to improve the methods of calculating the transformation of intraday flood flow and forecasting the shape of hydrographs, the search for the least time-consuming and the most acceptable methods of calculation. The proposed mathematical model allows to optimize the calculations.","PeriodicalId":136110,"journal":{"name":"Melioration and Water Management","volume":"8 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2020-07-03","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Melioration and Water Management","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.32962/0235-2524-2020-2-20-23","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

The purpose of the study is to develop a method for calculating flow schedules in the dams ‘ spillway structures, to consider the regularities of the flood flow transformation as a result of exceeding the inflow over the discharge of water into the pond. Given this process in the design of ponds, it is possible to reduce the maximum consumption and, accordingly, reduce the size of the spillway structures and their cost. The object of the study are ponds with small catchment areas, which are characterized by intra-day fluctuations in water flow due to intra-day fluctuations in air temperature and different rates of snow melting during the day. Most of the ponds in the Bryansk region are built on gullies, ravines, streams, very small rivers with small catchment areas, for which it is especially important to improve the methods of calculating the transformation of intraday flood flow and forecasting the shape of hydrographs, the search for the least time-consuming and the most acceptable methods of calculation. The proposed mathematical model allows to optimize the calculations.
对洪水流量变换计算方法的改进
本研究的目的是建立一种计算大坝泄洪道结构中水流规律的方法,以考虑超过入库水量超过排入池水量所导致的洪流量变化规律。在水池设计中考虑到这一过程,就有可能减少最大消耗,从而减少溢洪道结构的尺寸和成本。研究对象为集水区面积较小的池塘,这些池塘的特点是由于白天气温的波动和白天不同的融雪速度导致水流量在一天内波动。布良斯克地区的大多数池塘都建在沟壑、沟壑、溪流、集水区很小的河流上,因此,改进日内洪水流量转换的计算方法和预测水文曲线形状的方法,寻找最节省时间和最可接受的计算方法尤为重要。所提出的数学模型允许优化计算。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信