Multi-objective Optimization of Multi-Mode Repetitive Project Scheduling

Wei-xin Wang, Hua Meng, Haoming Wang, Jiafu Su
{"title":"Multi-objective Optimization of Multi-Mode Repetitive Project Scheduling","authors":"Wei-xin Wang, Hua Meng, Haoming Wang, Jiafu Su","doi":"10.1145/3460824.3460831","DOIUrl":null,"url":null,"abstract":"Multi-objective optimization of repetitive project scheduling problem with resource effectiveness is addressed. This problem considers the influence of the duration under work continuity and non-continuity, in order to comply with the relationship of project cost, project makespan and resource effectiveness. To solve the problem, multi-objective repetitive project scheduling model is proposed, and an cloud genetic algorithm is designed, which uses randomness and stability of Normal Cloud Model to generate priority of repetitive project scheduling activities and obtain repetitive project scheduling plan. The results showed that, in repetitive projects under work continuity and non-continuity, the performance comparison shows that the cloud genetic algorithm significantly outperforms the previous multi-objective algorithm.","PeriodicalId":315518,"journal":{"name":"Proceedings of the 2021 3rd International Conference on Management Science and Industrial Engineering","volume":"186 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2021-04-02","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Proceedings of the 2021 3rd International Conference on Management Science and Industrial Engineering","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1145/3460824.3460831","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

Multi-objective optimization of repetitive project scheduling problem with resource effectiveness is addressed. This problem considers the influence of the duration under work continuity and non-continuity, in order to comply with the relationship of project cost, project makespan and resource effectiveness. To solve the problem, multi-objective repetitive project scheduling model is proposed, and an cloud genetic algorithm is designed, which uses randomness and stability of Normal Cloud Model to generate priority of repetitive project scheduling activities and obtain repetitive project scheduling plan. The results showed that, in repetitive projects under work continuity and non-continuity, the performance comparison shows that the cloud genetic algorithm significantly outperforms the previous multi-objective algorithm.
多模式重复项目调度的多目标优化
研究了具有资源有效性的重复项目调度问题的多目标优化问题。该问题考虑了工作连续性和非连续性情况下工期的影响,以符合项目成本、项目最大完工时间和资源有效性的关系。针对这一问题,提出了多目标重复项目调度模型,并设计了一种云遗传算法,利用常规云模型的随机性和稳定性,生成重复项目调度活动的优先级,得到重复项目调度计划。结果表明,在工作连续性和非连续性的重复项目中,性能对比表明,云遗传算法明显优于之前的多目标算法。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信