Estimating the development effort of Web projects in Chile

S. Ochoa, M. Bastarrica, G. Parra
{"title":"Estimating the development effort of Web projects in Chile","authors":"S. Ochoa, M. Bastarrica, G. Parra","doi":"10.1109/LAWEB.2003.1250289","DOIUrl":null,"url":null,"abstract":"We present a method to fast estimate the development effort of Web-based information systems in Chile. The method, called Chilean Web application development effort estimation (CWADEE), addresses a necessity to get effort estimations in a short period of 24 to 72 hours using limited information. In contrast with other existing methods, CWADEE uses raw historical information about development capability and high granularity information about the system to be developed, in order to carry out such estimations. This method is simple and specially suited for small or medium-size Web-based information systems. CWADEE has been applied to twenty-two projects with very accurate results.","PeriodicalId":376743,"journal":{"name":"Proceedings of the IEEE/LEOS 3rd International Conference on Numerical Simulation of Semiconductor Optoelectronic Devices (IEEE Cat. No.03EX726)","volume":"35 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2003-11-10","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"21","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Proceedings of the IEEE/LEOS 3rd International Conference on Numerical Simulation of Semiconductor Optoelectronic Devices (IEEE Cat. No.03EX726)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/LAWEB.2003.1250289","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 21

Abstract

We present a method to fast estimate the development effort of Web-based information systems in Chile. The method, called Chilean Web application development effort estimation (CWADEE), addresses a necessity to get effort estimations in a short period of 24 to 72 hours using limited information. In contrast with other existing methods, CWADEE uses raw historical information about development capability and high granularity information about the system to be developed, in order to carry out such estimations. This method is simple and specially suited for small or medium-size Web-based information systems. CWADEE has been applied to twenty-two projects with very accurate results.
估算智利Web项目的开发工作量
我们提出了一种方法来快速估计基于web的信息系统在智利的发展努力。这种方法称为智利Web应用程序开发工作量估计(CWADEE),它需要使用有限的信息在24到72小时的短时间内获得工作量估计。与其他现有方法相比,CWADEE使用有关开发能力的原始历史信息和有关待开发系统的高粒度信息来进行此类估计。这种方法简单,特别适合中小型的基于web的信息系统。CWADEE已应用于22个项目,结果非常准确。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信