Experiences with criticality predictions in software development

C. Ebert
{"title":"Experiences with criticality predictions in software development","authors":"C. Ebert","doi":"10.1145/267895.267916","DOIUrl":null,"url":null,"abstract":"Cost-effective software project management has the serious need to focus resources on those areas with highest criticality. The paper focuses on two areas important for practical application of criticality-based predictions in real projects, namely the selection of a classification technique and the use of the results in directing management decisions. The first part is comprehensively comparing and evaluating five common classification techniques (Pareto classification, classification trees, factor-based discriminant analysis, fuzzy classification, neural networks) for identifying critical components. Results from a current large-scale switching project are included to show practical benefits. Knowing which technique should be applied the second area gains even more attention: What are the impacts for practical project management within given resource and time constraints? Several selection criteria based on the results of a combined criticality and history analysis are provided together with potential decisions.","PeriodicalId":297962,"journal":{"name":"ESEC '97/FSE-5","volume":"49 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"1997-11-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"16","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"ESEC '97/FSE-5","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1145/267895.267916","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 16

Abstract

Cost-effective software project management has the serious need to focus resources on those areas with highest criticality. The paper focuses on two areas important for practical application of criticality-based predictions in real projects, namely the selection of a classification technique and the use of the results in directing management decisions. The first part is comprehensively comparing and evaluating five common classification techniques (Pareto classification, classification trees, factor-based discriminant analysis, fuzzy classification, neural networks) for identifying critical components. Results from a current large-scale switching project are included to show practical benefits. Knowing which technique should be applied the second area gains even more attention: What are the impacts for practical project management within given resource and time constraints? Several selection criteria based on the results of a combined criticality and history analysis are provided together with potential decisions.
在软件开发中有临界预测的经验
具有成本效益的软件项目管理非常需要将资源集中在那些最重要的领域。本文着重于在实际项目中对基于临界性的预测的实际应用很重要的两个领域,即分类技术的选择和在指导管理决策中使用结果。第一部分综合比较和评价了用于识别关键部件的五种常用分类技术(帕累托分类、分类树、基于因素的判别分析、模糊分类、神经网络)。从目前的大型开关工程的结果包括显示实际效益。了解了应该应用哪种技术,第二个领域获得了更多的关注:在给定的资源和时间限制下,对实际项目管理的影响是什么?基于综合临界性和历史分析结果的几个选择标准与潜在的决策一起提供。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信