Pre-scheduling—a management tool?

ACM '71 Pub Date : 1900-01-01 DOI:10.1145/800184.810468
J. Hoffman, J. Gwynn
{"title":"Pre-scheduling—a management tool?","authors":"J. Hoffman, J. Gwynn","doi":"10.1145/800184.810468","DOIUrl":null,"url":null,"abstract":"The purpose of this paper was to introduce some of the preliminary findings resulting from the studies into the management of a class of computer based information systems which were conducted in the School of Information and Computer Science of the Georgia Institute of Technology. One of the main accomplishments was the specification of a pre-scheduling system which could monitor existing and future workloads and could identify effective processing sequences. The pre-scheduling procedure and its basic components were outlined through the identification of the fundamental defining expressions. The possible effects of the implementation of such a procedure were investigated through several experiments and a summary of these have been presented as to the effects of the pre-scheduling upon management decisions.","PeriodicalId":126192,"journal":{"name":"ACM '71","volume":"36 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"1900-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"ACM '71","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1145/800184.810468","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 1

Abstract

The purpose of this paper was to introduce some of the preliminary findings resulting from the studies into the management of a class of computer based information systems which were conducted in the School of Information and Computer Science of the Georgia Institute of Technology. One of the main accomplishments was the specification of a pre-scheduling system which could monitor existing and future workloads and could identify effective processing sequences. The pre-scheduling procedure and its basic components were outlined through the identification of the fundamental defining expressions. The possible effects of the implementation of such a procedure were investigated through several experiments and a summary of these have been presented as to the effects of the pre-scheduling upon management decisions.
预先安排——一种管理工具?
本文的目的是介绍佐治亚理工学院信息与计算机科学学院对一类基于计算机的信息系统的管理进行研究的一些初步发现。主要成果之一是规范了一个预先调度系统,该系统可以监视现有和未来的工作负载,并可以识别有效的处理顺序。通过对基本定义表达式的识别,概述了预调度过程及其基本组成部分。通过几个实验调查了实施这种程序可能产生的影响,并就预先安排对管理决策的影响提出了这些实验的总结。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信