{"title":"Wie der Konflikt zwischen Projekt und Linie beendet werden kann","authors":"M. Bergau","doi":"10.3139/9783446461574.012","DOIUrl":null,"url":null,"abstract":"","PeriodicalId":107495,"journal":{"name":"Wissen für Entscheider","volume":"30 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2019-08-05","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Wissen für Entscheider","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.3139/9783446461574.012","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}