Application of Trigger Point Mechanism in Time Decision-Making of Freeway Reconstruction and Extension

Haiqian Cheng, Hongxin Guan, Tiexin Liu
{"title":"Application of Trigger Point Mechanism in Time Decision-Making of Freeway Reconstruction and Extension","authors":"Haiqian Cheng, Hongxin Guan, Tiexin Liu","doi":"10.1109/ICOIP.2010.127","DOIUrl":null,"url":null,"abstract":"The adaptation of freeway to economy development is a sustaining and dynamic process, which presents a state from adaptation to no adaptation and to adaptation. The decision on the reconstruction and extension time of freeway is an important macroscopical decision-making matter. On the basis of analyzing the service level of freeway and the principle of trigger point mechanism, this paper has constructed time decision-making model of freeway reconstruction and extension and put forward the application method of the model. Besides, taking the Shui Guan freeway reconstruction and extension project in Shenzhen as example, an empirical analysis has been made to check the feasibility and efficiency of the model, which provides decision basis to determine reconstruction and extension time.","PeriodicalId":333542,"journal":{"name":"2010 International Conference on Optoelectronics and Image Processing","volume":"36 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2010-11-11","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"2010 International Conference on Optoelectronics and Image Processing","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/ICOIP.2010.127","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

The adaptation of freeway to economy development is a sustaining and dynamic process, which presents a state from adaptation to no adaptation and to adaptation. The decision on the reconstruction and extension time of freeway is an important macroscopical decision-making matter. On the basis of analyzing the service level of freeway and the principle of trigger point mechanism, this paper has constructed time decision-making model of freeway reconstruction and extension and put forward the application method of the model. Besides, taking the Shui Guan freeway reconstruction and extension project in Shenzhen as example, an empirical analysis has been made to check the feasibility and efficiency of the model, which provides decision basis to determine reconstruction and extension time.
触发点机制在高速公路改扩建时间决策中的应用
高速公路对经济发展的适应是一个持续的动态过程,呈现出从适应到不适应再到适应的状态。高速公路改扩建时间的决策是一个重要的宏观决策问题。在分析高速公路服务水平和触发点机制原理的基础上,构建了高速公路改扩建时间决策模型,并提出了该模型的应用方法。并以深圳水关高速公路改扩建工程为例,进行实证分析,验证该模型的可行性和有效性,为确定改扩建时间提供决策依据。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信