{"title":"Performing Verification and Validation for KT-OSS Development","authors":"Dae-Woo Kim, Hyun-Min Lira, Sang-Kon Lee","doi":"10.1109/ICCGI.2006.36","DOIUrl":null,"url":null,"abstract":"This paper describes verification and validation activities in KT-OSS (Korea Telecom Operations Supports System) development. In this paper, the verification and verification phases for KT-OSS development are based on the general software development lifecycle and add an additional phase to the lifecycle. To have a successful KT-OSS development, we need appropriate tests which focus on functionality, reliability, usability, efficiency in the development process of KT-OSS. This paper describes various tests performed in the KT-OSS development process and tests for maintaining the developed system according to the phases. And to control the quality for KT-OSS, we organized a testing & evaluation department which is independent from a development department. Through these testing activities, we have developed KT-OSS and released it successfully","PeriodicalId":112974,"journal":{"name":"2006 International Multi-Conference on Computing in the Global Information Technology - (ICCGI'06)","volume":"28 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2006-08-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"2006 International Multi-Conference on Computing in the Global Information Technology - (ICCGI'06)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/ICCGI.2006.36","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0
Abstract
This paper describes verification and validation activities in KT-OSS (Korea Telecom Operations Supports System) development. In this paper, the verification and verification phases for KT-OSS development are based on the general software development lifecycle and add an additional phase to the lifecycle. To have a successful KT-OSS development, we need appropriate tests which focus on functionality, reliability, usability, efficiency in the development process of KT-OSS. This paper describes various tests performed in the KT-OSS development process and tests for maintaining the developed system according to the phases. And to control the quality for KT-OSS, we organized a testing & evaluation department which is independent from a development department. Through these testing activities, we have developed KT-OSS and released it successfully