Solar PV Total Cost Calculation in Jawa-Madura-Bali System

M. Marbun, Ahmad Yusuf Salile, Dede Ridza Diana
{"title":"Solar PV Total Cost Calculation in Jawa-Madura-Bali System","authors":"M. Marbun, Ahmad Yusuf Salile, Dede Ridza Diana","doi":"10.1109/ICT-PEP57242.2022.9988911","DOIUrl":null,"url":null,"abstract":"Solar PV integration to any conventional power grid will impact the existing operational scheme, in some cases the PV integration will impact generation cost. Currently, the generation cost of PV determined by the Levelized Cost of Electricity, which omit the time series impact of intermittent power generation. The needs to calculate the total cost of PV implementation to the grid has been analyze by most of the electric utility company. With high target of PV integration to Jawa-Madura-Bali system, this total cost calculation will be calculated to show the real cost of PV as a whole generation cost. Based on the case study of Jawa-Madura-Bali in 2025 the total cost is 8.44 c$/kWh, which consists of LCOE, Grid Cost, balancing Cost, Backup Cost, and Utilization Effect.","PeriodicalId":163424,"journal":{"name":"2022 International Conference on Technology and Policy in Energy and Electric Power (ICT-PEP)","volume":"221 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2022-10-18","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"2022 International Conference on Technology and Policy in Energy and Electric Power (ICT-PEP)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/ICT-PEP57242.2022.9988911","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

Solar PV integration to any conventional power grid will impact the existing operational scheme, in some cases the PV integration will impact generation cost. Currently, the generation cost of PV determined by the Levelized Cost of Electricity, which omit the time series impact of intermittent power generation. The needs to calculate the total cost of PV implementation to the grid has been analyze by most of the electric utility company. With high target of PV integration to Jawa-Madura-Bali system, this total cost calculation will be calculated to show the real cost of PV as a whole generation cost. Based on the case study of Jawa-Madura-Bali in 2025 the total cost is 8.44 c$/kWh, which consists of LCOE, Grid Cost, balancing Cost, Backup Cost, and Utilization Effect.
爪哇-马杜拉-巴厘系统太阳能光伏总成本计算
太阳能光伏整合到任何传统电网都会影响现有的运行方案,在某些情况下光伏整合会影响发电成本。目前,光伏发电成本由平准化电价确定,忽略了间歇性发电的时间序列影响。大多数电力公司已经分析了计算光伏实施到电网的总成本的需求。由于光伏发电整合到爪哇-马杜拉-巴厘系统的目标很高,因此将计算总成本以显示光伏发电作为整个发电成本的实际成本。以2025年爪哇-马杜拉-巴厘电站为例,总成本为8.44 c$/kWh,由LCOE、电网成本、平衡成本、备用成本和利用效果组成。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信