{"title":"Solving the generalized base station placement problem in the planning of Broadband Power Line Communications access networks","authors":"A. Haidine, R. Lehnert","doi":"10.1109/ACCESSNETS.2007.4447106","DOIUrl":null,"url":null,"abstract":"Broadband Power Line Communications (B-PLC) technology is an alternative for broadband access networks, allowing bit rates up to currently 200Mbps. This technique uses the wiring of the low-voltage grid in order to offer to the users the telecommunications services, such as Internet. In this paper, the B-PLC planning process is sub-divided into two parts, which are the Generalized Base Station Placement (GBSP) and the PLC Channel Allocation Problem (P-CAP). This paper focuses on GBSP that is formulated as multi-objective combinatorial optimization and solved by the means of metaheuristics. Two optimization approaches are used to solve it: the classical approach based on single-objective optimization and the modern approach based on multi-objective optimization. Their performances are evaluated and compared with each other.","PeriodicalId":393914,"journal":{"name":"2007 Second International Conference on Access Networks & Workshops","volume":"240 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2007-08-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"12","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"2007 Second International Conference on Access Networks & Workshops","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/ACCESSNETS.2007.4447106","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 12
Abstract
Broadband Power Line Communications (B-PLC) technology is an alternative for broadband access networks, allowing bit rates up to currently 200Mbps. This technique uses the wiring of the low-voltage grid in order to offer to the users the telecommunications services, such as Internet. In this paper, the B-PLC planning process is sub-divided into two parts, which are the Generalized Base Station Placement (GBSP) and the PLC Channel Allocation Problem (P-CAP). This paper focuses on GBSP that is formulated as multi-objective combinatorial optimization and solved by the means of metaheuristics. Two optimization approaches are used to solve it: the classical approach based on single-objective optimization and the modern approach based on multi-objective optimization. Their performances are evaluated and compared with each other.