Uncertainty and incomplete information in the evaluation of building projects

P. Bowen, P. Edwards
{"title":"Uncertainty and incomplete information in the evaluation of building projects","authors":"P. Bowen, P. Edwards","doi":"10.1080/10293523.1985.11082237","DOIUrl":null,"url":null,"abstract":"Deterministic methods of price forecasting and viability analysis for construction projects do not adequately cater for uncertainty and incomplmplete information. Developers and other investors in property, acting solely on the deterministic advice of professional building cost consultants (such as quantity surveyors), may make inappropriate investment decisions which are less realistic than might be considered desirable. Probabilistic methodologies, and in particular expert systems, a form of artificial intelligence, permit the explicit treatment of uncertainty and incomplete information, and the contribution of these techniques towards the assessment of risk should lead to more realistically grounded investment decisions.","PeriodicalId":126195,"journal":{"name":"The Investment Analysts Journal","volume":"28 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"1985-11-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"2","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"The Investment Analysts Journal","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1080/10293523.1985.11082237","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 2

Abstract

Deterministic methods of price forecasting and viability analysis for construction projects do not adequately cater for uncertainty and incomplmplete information. Developers and other investors in property, acting solely on the deterministic advice of professional building cost consultants (such as quantity surveyors), may make inappropriate investment decisions which are less realistic than might be considered desirable. Probabilistic methodologies, and in particular expert systems, a form of artificial intelligence, permit the explicit treatment of uncertainty and incomplete information, and the contribution of these techniques towards the assessment of risk should lead to more realistically grounded investment decisions.
建筑项目评估中的不确定性和不完全信息
建筑项目的价格预测和可行性分析的确定性方法不能充分满足不确定性和不完整的信息。发展商及其他物业投资者,若完全按照专业建筑成本顾问(例如工料测量师)的确定性意见行事,可能会作出不适当的投资决定,而这些决定不太现实,可能会被认为是可取的。概率方法,特别是专家系统,人工智能的一种形式,允许明确处理不确定性和不完整的信息,这些技术对风险评估的贡献应该导致更现实的投资决策。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信